Plan Details

Status:
Final
Type:
SUBDPLAT
Apply Date:
02/07/2006
Applicant:
STANTEC
Description:
SUBC
Contractors:
  • STANTEC

Completed Inspections

Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 5
Date Description Inspector Results Comments
09/11/2008 ASSURANCE - DOT TRAFFIC TSTOCKET Approved PLAN NO. : I-2006-093

This project was inspected and is acceptable to Traffic Engineering as of Sept. 11, 2008.
Lots 1448 to 1530.
10/23/2008 ASSURANCE - DOT PERMITS & CODE RLEIGH Approved PLAN NO. : I-2006-093

The work outlined in the subject Private Improvement Agreement contract has been completed . On October 23, 2008, the City of Tucson has accepted the right-of-way improvements associated with Sierra Morado Unit 4, Phase 1 subdivision for operation and maintenance. All remaining sidewalks to be constructed shall be construction under separate right-of-way permits. Maintenance of sidewalk areas is the responsibility of the abutting property owner.
03/02/2009 ASSURANCE - UTILITY SERVICES LHERNAND Approved SEE SIRE
10/06/2010 ASSURANCE - DSD DROBERTS Approved THE SITE WAS CHECKED TO VERIFY WHAT WORK HAD BEEN STARTED AT THIS TIME AND WHERE THEY MAYBE IN REGARDS TO ASKING FOR LOT RELEASES. A PARTIAL RELEASE OF THIS SITE HAD BEEN DONE IN THE PAST. LOT RELEASES WILL ONLY BE CONSIDERED IN THE AREAS WHERE WE HAVE RECEIVED AND ACCEPTANCE OF DISCHARGE LETTER FROM PIMA COUNTY WASTEWATER. THIS AREA IS LIMITED ONLY TOO LOTS 1448 TO 1530, ALL OTHER LOTS ARE NOT RELEASEABLE AT THIS TIME AND WILL REQUIRE AN ADDITIONAL RELEASE LETTER.
THE CONTRACTOR HAS COMPLETED 90% OF THE ROADS IN PHASE 2 PORTION OF THIS SITE AND HAVE ROUGHLY CUT THE BASINS. THESE LOTS CAN NOT BE RELEASED UNTIL WE HAVE RECEIVED A RELEASE LETTER FROM PCWW. CURRENTLY EITHER ALL OR PORTIONS OF WHITE SAGE DRIVE, MORNING SHADOWS DRIVE,SUNRISE PARK ROAD, PALMETTO POINTE TRAIL, PASSION FLOWER LANE, AND PRAIRIE WIND TRAIL HAVE NOT BEEN CONSTRUCTED. ANY RELEASES OF THIS SITE WILL REQUIRE AN INSPECTION TO VERIFY THAT ALL REQUIRED WORK IS COMPLETE, AND THAT A ACCEPTANCE OF DISCHARGE LETTER HAS BEEN GIVEN FOR PHASE 2 OF THIS SITE.
11/17/2010 ASSURANCE - PC WASTEWATER RMONTOYA Approved LOTS 1118-1153 1311-1328
G-2009-036
SEE SIRE

Plan Reviews

Plan Number - S06-031
Plan Status: Final
Plan Description: SUBC
Start Date Submittal Complete Date Status  
02/08/2006 TENTATIVE PLAT REVIEW 04/18/2006 COMPLETED Review Details
04/19/2006 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 06/12/2006 COMPLETED Review Details
04/23/2007 RESUBMITTAL - CDRC - FINAL PLAT REVIEW 05/31/2007 COMPLETED Review Details
04/23/2007 ASSURANCES 06/18/2007 COMPLETED Review Details
05/08/2006 FINAL PLAT REVIEW 06/16/2006 COMPLETED Review Details
06/05/2007 FINAL PLAT PACKAGE 06/29/2007 COMPLETED Review Details
06/16/2009 REVISN TENT PLAT & CORE RESUB 07/23/2009 COMPLETED Review Details
07/24/2006 RESUBMITTAL - CDRC - FINAL PLAT REVIEW 10/06/2006 COMPLETED Review Details
07/24/2006 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 09/19/2006 COMPLETED Review Details
07/24/2006 ASSURANCES 08/04/2006 COMPLETED Review Details
09/28/2007 CORE REVIEW 10/31/2007 COMPLETED Review Details
10/04/2006 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 11/14/2006 COMPLETED Review Details
10/09/2006 RESUBMITTAL - CDRC - FINAL PLAT REVIEW 11/14/2006 COMPLETED Review Details
10/09/2006 ASSURANCES 11/07/2006 COMPLETED Review Details
11/05/2007 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 12/10/2007 COMPLETED Review Details
12/06/2006 RESUBMITTAL - CDRC - FINAL PLAT REVIEW 01/05/2007 COMPLETED Review Details

Completed Activity Conditions

Plan Number - S06-031
Plan Description: SUBC
Date Name Approved Comments
CD