Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Details

Status:
Approved
Type:
Land Division
Apply Date:
06/10/2005
Applicant:
Unknown
Description:
ALDEA DEL NORTE
Architects:
  • City of Tucson DTM Streets and Traffic Maintenance
  • LAWYERS TITLE OF ARIZONA
  • VILANOVA DEVELOPMENT LLC
Contractors:

Completed Inspections

Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 3
Date Description Inspector Results Comments
09/10/2007 COT - WATR - Design Plan Construction Passed {Activity date: 09/10/2007; Status: Approved; Inspector: LHERNAND; Comment: Entered by THAUSER1 - 2-075-2006}
05/05/2008 SPECIAL INSPECTION - Pima County Sewer (Third Party) Passed {Activity date: 05/05/2008; Status: Approved; Inspector: RMONTOYA; Comment: Entered by THAUSER1 - G-2006-100}
01/11/2013 COT - ENGR - Site - Assurance Release Passed {Activity date: 01/11/2013; Status: Approved; Inspector: DROBERTS; Comment: Entered by KMEDINA1 - } ; {Activity date: 03/30/2012; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - JOE SENT ME THE INFORMATION FOR THE RELEASE OF LOT #6, THE PAPERWORK FOR THIS SITE. WE WILL NOT BE ABLE TO TYPE THE RELEASE LETTER TILL THE FIRST PART OF NEXT WEEK ONCE KRISTINA RETURNS.} ; {Activity date: 03/27/2012; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - TRIED TO CONTACT JOSEPH TAJC FROM STEWART TO DISCUSS THE ISSUES WITH LOT 6 AND WHAT IT WILL TAKE TO GET IT RELEASED. HE WILL SEND ME THE INFORMATION THAT I HAVE REQUESTED BEFORE WE WILL GIVE HIM A RELEASE OF THE LOT.
} ; {Activity date: 03/27/2012; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - TALKED TO JIM ABOUT A CONFLICT IN THE LOT LINES BETWEEN LOT #6 AND #4. THE EXISTING HOUSE ON LOT #6 IS SUPPOSEDLY TOO CLOSE TOO THE PROPERTY LINE AND WILL NEED TO AQUIRE ADDITIONAL FOOTAGE FROM THE OWNER OF LOT #4. THESE CHANGES WILL NEED TO BE NOTED ON THE PLOT PLAN FOR THESE LOTS, BUT DO NOT HAVE TO BE REPLATTED.} ; {Activity date: 03/20/2012; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - TALKED TO THE TITLE AGENTS FOR THIS SITE AND ADVISED THEM THAT LOT #6 WAS STILL NOT RELEASEABLE AT THIS TIME DUE TO THE FACT THAT THE SIDEWALK AREA ADJACENT TO THIS SITE WAS NOT ADA COMPLIANT IN THE AREA OF THE DRIVEWAY AND THE APPROACHES. THEY WILL DISCUSS THIS WITH THE CURRENT PROPERTY OWNER AND TRY TO RESOLVE HOW THEY WILL BRING THIS SITE INTO COMPLIANCE PRIOR TO REQUESTING ANOTHER INSPECTION.} ; {Activity date: 03/15/2012; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - DROVE THROUGH THE SITE TO SEE IF ANY CHANGES HAVE BEEN MADE TO THE SIDEWALK AND DRIVEWAY AREA FOR LOT #6, NOTHING HAS HCANGED AT THIS TIME. THIS LOT IS STILL IN A NON COMPLIANT STATUS FOR THE ADA ACCESS THROUGH THE DRIVEWAY AREA AND IN THE APPROACHES ON BOTH SIDES. THIS LOT CAN NOT BE RELEASED AT THIS TIME DJUE TO THESE OUTSTANDING ISSUES. A SOLD SIGN HAS BEEN NOTED IN FRONT OF THIS HOME AND WILL BE ADDRESSED ONCE I CONTACT THE TITLE AGENT FOR THIS SITE.} ; {Activity date: 09/19/2011; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - SEE THE PREVIOUS COMMENTS THAT HAVE BEEN ADDRESSED ON 8/24/2010 FOR THE REMAINING OUTSTANDING LIST OF ITEMS PRIOR TO THE FINAL RELEASE OF THE ASSURANCES. LOTS NUMBER 6 AND 9 REMAIN IN THE ORIGINAL TRUST ALL OTHER LOTS HAVE BEEN PLACED IN A NEW SUBSTITUTE. CURRENTLY ONLY LOT NUMBER 9 IS RELEASABLE AT THIS TIME ALL OTHERS WILL REQUIRE AN ADDITIONAL INSPECTION PRIOR TO AN OFFICIAL RELEASE.} ; {Activity date: 09/20/2010; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT2 - PAUL NZOMO ADVISED ME THAT THE NEW OWNERS HAVE APPLIED FOR THE SUBSTITUTE ASSURANCES FOR THIS SITE AND WILL BE ASKING FOR THE RELEASES OF SOME OF THE REMAINING LOTS IN THE NEAR FUTURE. I REMINDED HIM THAT THERE STILL ARE OUTSTANDING ISSUES WITH THE SIDEWALKS AND DRIVEWAYS OF LOT #6. AS-WELL-AS WITH THE RETENTION/DETENTION BASIN LOCATED IN THE NORTHEAST CORNER OF THIS SITE THAT CURRENTLY HAS A SMALL SINK-HOLE LOCATED WITHIN IT.} ; {Activity date: 07/28/2010; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT2 - DOWNLOADED THE PHOTO'S THAT WERE TAKEN ON THE 7/12/2010 AND STARTED LOOKING AT WHAT ISSUES HAVE ARISEN AND WILL NEED TO BE FIXED PRIOR TO ALL FINAL RELEASES.} ; {Activity date: 08/24/2010; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT2 - THIS SITE HAS TWO HOUSES CONSTRUCTED, (LOTS #6 AND #9) ONE OF WHICH IS OCCUPIED(LOT#9). THIS WAS ALL DONE PRIOR TO THE INITIAL RELEASE BACK ON 7/12/2010. A THIRD LOT #8 HAS BEEN SOLD WITH THE RELEASE LETTER BEING ISSUED ON 7/31/2010.
LOT #6 HAS ISSUES WITH THE DRIVEWAY AND THE ADJACENT SIDEWALK/PEDESTRIAN ACCESS AREA THAT HAVE BEEN CONSTRUCTED OUT OF BRICK PAVERS. THE SIDEWALK CROSS SLOPES HAVE NOT BEEN MAINTAINED IN THE ADA PATH AS IT CROSSES THE DRIVEWAY LOCATION. I WILL CONTACT THE ZONING SECTION TO VERIFY WHAT REPAIRS WILL NEED TO BE MADE TO THIS SITE PRIOR TO ALLOWING THIS SITE TO BE RELEASED AND OCCUPIED. MET WITH PATRICIA GEHLEN ON 8/25/2010, SHE VERIFIED THAT THE ACCESS ACROSS THE DRIVEWAY NEEDED TO BE MAINTAINED WITH A 2% CROSS SLOPE OR LESS TO STAY WITHIN COMPLIANCE. THE RELEASE OF THIS LOT WILL BE DEPENDANT UPON THE COMPLETION OF THE NECESSARY REPAIRS IN THE SIDEWALK AREA.} ; {Activity date: 08/24/2010; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT2 - MET WITH THE DEVELOPER AND ENGINEER OF RECORD(PAUL ZOMO) OUT ON SITE AND DISCUSSED WHAT IS THEIR INTENT FOR THE DEVELOPING OF THIS SITE. I HAVE ASKED THAT THE DEVELOPER TO EITHER PLACE A SUBSTITUTE ASSURANCE PACKAGE FOR THE LOTS THAT THEY ARE WANTING AND WE WILL DO UPTO A 75% RELEASE OF THE SITE. OR THEY CAN PLACE A COMPLETION BOND FOR ALL OF THE REMAINING ASSURABLE ITEMS THAT ARE NOT CONSTRUCTED AT THIS TIME. THE WILL BE WORKING ON THE REQUEST FOR LOTS 1-5, 7, 10-12, LOTS 6,8, & 9 WILL STAY UNDER THE ORIGINAL ASSURANCE FOR THIS SITE.} ; {Activity date: 07/12/2010; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT2 - OK FOR A PARTIAL RELEASE FOR THIS SITE. A FINAL WILL NOT BE GIVEN UNTIL ALL OF THE ASSURE ABLE ITEMS HAVE BEEN COMPLETED. THE FOLLOWING ITEMS HAVE BEEN NOTED AS DIFFICIENT AT THIS TIME: 1)THE SITE IS IN NEED OF SOME WEED CONTROL THROUGHOUT THE SITE AND ALL COMMON AREAS. 2) A SINK HOLE HAS BEEN NOTED IN THE RETENTION/DETENTION BASIN LOCATED IN THE NORTH EAST CORNER OF THE SITE. THIS NEEDS TO BE CHECKED BY THE ENGINEER OF RECORD, AND A WRITTEN DESCRIPTION OF WHAT CAUSED THE PROBLEM AND HOW IT WILL BE ADDRESSED NEEDS TO BE GIVEN TO THIS DEPARTMENT. 3) BRICK PAVERS HAVE BEEN PLACED IN THE DRIVE WAY AREA OF ONE OF THE LOTS THAT IS NOT ACCORDING PER OUR APPROVED DEVELOPMENT STANDARDS FOR SLOPE AND GRADE. THIS WILL NEED TO BE CHANGED AS SHOWN ON THE APPROVED PLANS OR MODIFIED AS PER THE ENGINEER OF RECORD AND AS-BUILT DRAWINGS SUBMITTED FOR APPROVAL.4) MINOR DRAINAGE PROBLEMS HAVE BEEN NOTED THROUGHOUT THE SITE THAT MAY RESULT INTO LOT TO LOT DRAINAGE COMPLAINTS.}

Plan Reviews

Plan Number - S05-094
Plan Status: Approved
Plan Description: ALDEA DEL NORTE
Start Date Submittal Complete Date Status  
01/12/2007 ASSURANCES 02/14/2007 COMPLETED Review Details
01/12/2007 RESUBMITTAL - CDRC - FINAL PLAT REVIEW 02/22/2007 COMPLETED Review Details
03/19/2007 RESUBMITTAL - CDRC - FINAL PLAT REVIEW 04/02/2007 COMPLETED Review Details
04/06/2006 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 05/13/2006 COMPLETED Review Details
04/11/2007 FINAL PLAT PACKAGE 05/09/2007 COMPLETED Review Details
06/13/2005 TENTATIVE PLAT REVIEW 07/21/2005 COMPLETED Review Details
08/29/2006 FINAL PLAT REVIEW 10/13/2006 COMPLETED Review Details
09/21/2006 REVISION - TENTATIVE PLAT REVIEW 10/20/2006 COMPLETED Review Details
10/04/2005 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 11/01/2005 COMPLETED Review Details
10/20/2006 RESUBMITTAL - CDRC - FINAL PLAT REVIEW 12/05/2006 COMPLETED Review Details
12/23/2005 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 01/28/2006 COMPLETED Review Details

Documents

File Name Document Type  
S05-094 ASSURANCE LOG.XLS ASSURANCES VIEW
S05-094 COMMENT SHEET.XLS ASSURANCES VIEW
ORIGINAL AGREEMENT RESOLUTION #20682 ASSURANCES VIEW
RELEASE LETTER 2013_01_15.PDF ASSURANCES VIEW
RELEASE LETTER 2012_9_28.PDF ASSURANCES VIEW
RELEASE LETTER 2012_05_17.PDF ASSURANCES VIEW
RELEASE LETTER 2012_04_04.PDF ASSURANCES VIEW
RELEASE LETTER 2011_10_13.PDF ASSURANCES VIEW
RELEASE LETTER 2011_09_14.PDF ASSURANCES VIEW
RELEASE LETTER 2011_08_31.PDF ASSURANCES VIEW
PARTIAL RELEASE 2008-07-31 ASSURANCES VIEW
RELEASE REQUEST 2008-07-10 ASSURANCES VIEW
LOT RELEASE MAP.TIF ASSURANCES VIEW
SUBSTITUTE ASSUR LOTS 1-5,7,10-12_2010_10_15.PDF ASSURANCES VIEW
SUBSTITUTE ASSURANCE LOTS 6 AND 9 2010_10_15.PDF ASSURANCES VIEW
None DOCUMENTS VIEW
TENTATIVE_01.TIF PLATS VIEW
TENTATIVE_02.TIF PLATS VIEW
TENTATIVE_03.TIF PLATS VIEW
LANDSCAPE_01.TIF PLATS VIEW
LANDSCAPE_02.TIF PLATS VIEW
LANDSCAPE_03.TIF PLATS VIEW
NPP_01.TIF PLATS VIEW
NPP_02.TIF PLATS VIEW
ZONING REVIEW.XLS PLATS VIEW
ZONING_REVIEW_TP1.TIF PLATS VIEW
ZONING_REVIEW_TP2.TIF PLATS VIEW