Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Plan Details

Status:
Approved
Type:
Land Division
Apply Date:
05/07/2003
Applicant:
N/A
Description:
RANCHO PARAISO

Completed Inspections

Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 4
Date Description Inspector Results Comments
09/21/2004 COT - WATR - Design Plan Construction Passed {Activity date: 09/21/2004; Status: Approved; Inspector: LHERNAND; Comment: Entered by THAUSER1 - }
11/17/2004 SPECIAL INSPECTION - OTHER (Third Party) Passed {Activity date: 11/17/2004; Status: Approved; Inspector: SRAVAL; Comment: Entered by THAUSER1 - }
08/23/2006 TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) Passed {Activity date: 08/23/2006; Status: Approved; Inspector: TSTOCKET; Comment: Entered by THAUSER1 - }
04/20/2007 COT - ENGR - Site - Assurance Release Passed {Activity date: 04/20/2007; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT2 - THE SITE WAS CHECKED FOR THE FINAL RELEASE AND HAS BEEN FOUND TO BE COMPLETE EXCEPT FOR THE FOLLOWING ITEM:
1) PROVIDE A SET ASBUILT-DRAWINGS THAT SHOWS ALL OF THE MODIFICATIONS THAT HAVE BEEN MADE TO THIS SITE. THIS WILL INCLUDE BUT IS NOT LIMITED TO THE INSTALLATION OF LOW FLOW PIPES FROM THE RETENTION / DETENTION BASINS, AS-WELL-AS THE CHANGE OF THE DRAINAGE WAY LOCATED AT THE SOUTH EAST CORNER OF THE SITE.
2) PROVIDE A CERTIFICATION LETTER FROM THE SIGNING ENGINEER STATING THAT ALL DRAINAGE WAYS AND BASINS HAVE BEEN CONSTRUCTED PER THE APPROVED PLANS, SPECIFICATIONS, STANDARDS, OR AS-BUILT DRAWINGS, AND ARE FUCTIONING PER THE PIMA COUNTY / CITY OF TUCSON RETENTION/DETENTION MANUAL, AND THE APPROVED DRAINAGE REPORT.} ; {Activity date: 06/22/2005; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT2 - ASSURABLE ITEMS FOR THIS SITE HAVE BEEN COMPLETED EXCEPT FOR PORTION OF SIDEWALK. A COMPLETION BOND WILL BE REQUIRED PRIOR TO FINAL RELEASE OF ASSURANCES.} ; {Activity date: 02/07/2006; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT2 - 1) PROVIDE A BASIN CERTIFICATION LETTER PRIOR TO THE FINAL RELEASE OF ALL ASSURANCES FOR THIS SITE.
2) REPAIR THE ACCESS GATE INTO THE BASINS OFF OF ADVENTURE TRAIL THAT HAVE BEEN DAMAGED AT THIS TIME}

Plan Reviews

Plan Number - S03-009
Plan Status: Approved
Plan Description: RANCHO PARAISO
Start Date Submittal Complete Date Status  
05/07/2003 TENTATIVE PLAT REVIEW 06/09/2003 COMPLETED Review Details
06/30/2003 RESUBMITTAL - TENTATIVE PLAT REVIEW 07/17/2003 COMPLETED Review Details
08/06/2003 RESUBMITTAL - TENTATIVE PLAT REVIEW 08/11/2003 COMPLETED Review Details
08/12/2003 FINAL PLAT REVIEW 09/12/2003 COMPLETED Review Details
08/12/2003 ASSURANCES 11/10/2003 COMPLETED Review Details
11/13/2003 RESUBMITTAL - FINAL PLAT REVIEW 11/18/2003 COMPLETED Review Details

Documents

File Name Document Type  
FINAL_01.TIFF PLATS VIEW
FINAL_02.TIFF PLATS VIEW
FINAL_03.TIFF PLATS VIEW
FINAL_04.TIFF PLATS VIEW
TENTATIVE_01.TIF PLATS VIEW
TENTATIVE_02.TIF PLATS VIEW
TENTATIVE_03.TIF PLATS VIEW
LANDSCAPE_01.TIF PLATS VIEW
LANDSCAPE_02.TIF PLATS VIEW
LANDSCAPE_03.TIF PLATS VIEW
LANDSCAPE_04.TIF PLATS VIEW
LANDSCAPE_05.TIF PLATS VIEW
LANDSCAPE_06.TIF PLATS VIEW
LANDSCAPE_07.TIF PLATS VIEW
LANDSCAPE_08.TIF PLATS VIEW
NPP_01.TIF PLATS VIEW
NPP_02.TIF PLATS VIEW
NPP_03.TIF PLATS VIEW
NPP_04.TIF PLATS VIEW
NPP_05.TIF PLATS VIEW
NPP_06.TIF PLATS VIEW
NPP_07.TIF PLATS VIEW
NPP_08.TIF PLATS VIEW
NPP_09.TIF PLATS VIEW
ZONING_REVIEW.XLS PLATS VIEW
ZONING_REVIEW1.TIF PLATS VIEW
ZONING_REVIEW2.TIF PLATS VIEW