Permit: TD-DEV-1224-00333
Permit Details
Status:
Issued
Type:
Development Package
Address:
980 W IRVINGTON RD
Address NEW:
980 W IRVINGTON RD
Apply Date:
12/10/2024
Applicant:
Erin Harris
Description:
Rev 2 - started 04.15.2026 ** Rev 1 - water meter update - started 12.16.2025 ** Yourspace Self Storage development Package
Permit Reviews
Permit Number - TD-DEV-1224-00333
Permit Status: Issued
Permit Description: Rev 2 - started 04.15.2026 ** Rev 1 - water meter update - started 12.16.2025 ** Yourspace Self Storage development Package
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/09/2025 | DEVELOPMENT PACKAGE NEW v.2 | 03/03/2025 | REQUIRES RESUBMIT |
| 04/15/2026 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 05/26/2026 | REQUIRES RESUBMIT |
| 04/23/2025 | DEVELOPMENT PACKAGE NEW v.3 | 05/20/2025 | REQUIRES RESUBMIT |
| 10/09/2025 | DEVELOPMENT PACKAGE NEW v.7 | 10/22/2025 | APPROVED |
| 12/17/2025 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 01/06/2026 | APPROVED |
| 12/16/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 12/16/2025 | REQUIRES RESUBMIT |
| 12/10/2024 | DEVELOPMENT PACKAGE NEW v.1 | 12/19/2024 | REQUIRES RESUBMIT |
| 10/06/2025 | DEVELOPMENT PACKAGE NEW v.6 | 10/07/2025 | REQUIRES RESUBMIT |
| 09/16/2025 | DEVELOPMENT PACKAGE NEW v.5 | 10/06/2025 | REQUIRES RESUBMIT |
| 06/08/2026 | DEVELOPMENT PACKAGE NEW REVISION v.3 | 07/07/2026 | REQUIRES RESUBMIT |
| 08/12/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/18/2026 | APPROVED |
| 07/14/2026 | DEVELOPMENT PACKAGE NEW REVISION v.4 | 07/24/2026 | APPROVED |
| 06/20/2025 | DEVELOPMENT PACKAGE NEW v.4 | 07/08/2025 | REQUIRES RESUBMIT |
| 05/28/2026 | DEVELOPMENT PACKAGE NEW REVISION v.2 | N/A | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TD-DEV-1224-00333
Permit Status: Issued
Permit Description: Rev 2 - started 04.15.2026 ** Rev 1 - water meter update - started 12.16.2025 ** Yourspace Self Storage development Package
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 05/21/2026 | Zoning Approval Letter |
| 06/16/2026 | CRWH PLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT |
Conditions
Permit Number - TD-DEV-1224-00333
Permit Status: Issued
Permit Description: Rev 2 - started 04.15.2026 ** Rev 1 - water meter update - started 12.16.2025 ** Yourspace Self Storage development Package
| Date | Description | Comments |
|---|---|---|
| 10/22/2025 | Provide proof of recordation of abandonment of easement |
Outstanding Inspections
Permit Status: Issued
Permit Number: TD-DEV-1224-00333
Permite Description: Rev 2 - started 04.15.2026 ** Rev 1 - water meter update - started 12.16.2025 ** Yourspace Self Storage development Package
Total Outstanding Inspections - 8
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/15/2026 | SITE - SWPPP Violation Notice | N/A | Failed | Excessive trackout through shopping center onto Irvington Rd. Rebuild trackout pad and sweep shopping center and Irvington Road. |
| 04/15/2026 | For trash and recycling enclosures | N/A | Partial Pass | Okay to pour slab and verticals monolithically. |
| 06/11/2026 | N/A | Partial Pass | OK to pour the curb on the southwest of the building | |
| 06/22/2026 | N/A | Partial Pass | Subgrade from south edge of building to north end of parking lot: compaction is good (reports to be uploaded), overall slopes are correct. Curb elevations are accurate. Line on curb marks top of AB. Some areas of subgrade are a little low - to be leveled out prior to AB. Broken curb on NE to be repaired. Okay to place AB. | |
| 07/23/2026 | Grading Progress ENGR | N/A | Partial Pass | 1st lift of Asphalt Paving is starting today. AB Compaction tests completed and comply at 100%. Results will be submitted. Schedule another paving inspection for tomorrow and again the day before 2nd lift. If moving handicap parking and crosswalk to next bay south is not approved contractor is at risk. Okay to pave from first parking bay at SE corner of building going north and progressing around building. |
| 07/23/2026 | SITE - Stormwater Follow-up | N/A | Partial Pass | 7/23/26 Check to make sure routine biweekly's are recorded in SWPPP book... |
| 07/24/2026 | ENGR Paving | N/A | Partial Pass | Handicap parking and access aisle area AB are close to 2%. Ensure they are not over 2.0% and cross walk walks not over 2% cross-slope when paving is complete. The rest of the site from the RV parking area at North to the drive entrance Okay to continue paving 1st lift. When complete joint at South entrance to existing paving to be tacked w/ neat saw cut. |
| 08/07/2026 | N/A | Not Ready | Side of basin slope exceeds 2:1 in some areas per detail for hand placed riprap. Reschedule when rip rap is complete and you are ready. |
Completed Inspections
Permit Status: Issued
Permit Number: TD-DEV-1224-00333
Permit Description: Rev 2 - started 04.15.2026 ** Rev 1 - water meter update - started 12.16.2025 ** Yourspace Self Storage development Package
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/23/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
| 01/30/2026 | NPPO Pre-Construction | Passed | Plant preservation is in accordance with NPPO plans. | |
| 02/05/2026 | SITE - Stormwater Setup and Controls | Passed | Stormwater controls are setup according to approved plans. Currently adding wattle to wall drains at NE and extra wattle along North border. Pre-existing storm drain pipe along East border has been cut open in the rough grading process, this will be cleaned up and repaired. |
Scheduled Inspections
Scheduled Inspections - TD-DEV-1224-00333
Status: Issued
Description: Rev 2 - started 04.15.2026 ** Rev 1 - water meter update - started 12.16.2025 ** Yourspace Self Storage development Package
| Scheduled Date | Description | Entered By | Entered Date |
|---|---|---|---|
| SITE - Stormwater Follow-up | Scheduled |