Inspection History Details
Inspection Status: Re-inspection required
Inspection History: SITE - Stormwater Setup and Controls
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/30/2026 | SITE - Stormwater Setup and Controls | Re-inspection required | Stormwater controls are not in place yet. Recall this inspection when controls are installed. Site is okay for clearing and grubbing. | |
| 02/05/2026 | SITE - Stormwater Setup and Controls | Passed | Stormwater controls are setup according to approved plans. Currently adding wattle to wall drains at NE and extra wattle along North border. Pre-existing storm drain pipe along East border has been cut open in the rough grading process, this will be cleaned up and repaired. |