Inspection History Details
Inspection Status: Not Ready
Inspection History
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/12/2026 | Not Ready | contractor is grading. The pad for the building has not started the civil plans yet. | ||
| 03/19/2026 | Partial Pass | contractor graded around the building on the east side and on the north side I had a conversation with the contractor was asking me about the tapping into the sewer line. Surveyor was on site and we had them survey. The sewer line and the line is in Adot right away. |
||
| 06/22/2026 | Partial Pass | Subgrade from south edge of building to north end of parking lot: compaction is good (reports to be uploaded), overall slopes are correct. Curb elevations are accurate. Line on curb marks top of AB. Some areas of subgrade are a little low - to be leveled out prior to AB. Broken curb on NE to be repaired. Okay to place AB. |