Permit: TD-DEV-1223-00492
Permit Details
Apply Date:
12/22/2023
Applicant:
Andrew Diller
Description:
Revision 3 - Development Package for new Mister Car Wash building.
Permit Reviews
Permit Number - TD-DEV-1223-00492
Permit Status: Issued
Permit Description: Revision 3 - Development Package for new Mister Car Wash building.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/04/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 04/25/2025 | REQUIRES RESUBMIT |
| 11/07/2024 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 01/10/2025 | REQUIRES RESUBMIT |
| 04/25/2025 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 04/28/2025 | APPROVED |
| 08/09/2024 | DEVELOPMENT PACKAGE NEW v.5 | 09/12/2024 | REQUIRES RESUBMIT |
| 01/16/2025 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 01/28/2025 | APPROVED |
| 09/13/2024 | DEVELOPMENT PACKAGE NEW v.6 | 09/27/2024 | APPROVED |
| 04/30/2024 | DEVELOPMENT PACKAGE NEW v.3 | 05/31/2024 | REQUIRES RESUBMIT |
| 06/24/2024 | DEVELOPMENT PACKAGE NEW v.4 | 07/31/2024 | REQUIRES RESUBMIT |
| 03/12/2024 | DEVELOPMENT PACKAGE NEW v.2 | 04/12/2024 | REQUIRES RESUBMIT |
| 01/16/2024 | DEVELOPMENT PACKAGE NEW v.1 | 02/12/2024 | REQUIRES RESUBMIT |
| 06/09/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 07/16/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TD-DEV-1223-00492
Permit Status: Issued
Permit Description: Revision 3 - Development Package for new Mister Car Wash building.
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/02/2025 | CRWHPLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT |
Outstanding Inspections
Permit Status: Issued
Permit Number: TD-DEV-1223-00492
Permite Description: Revision 3 - Development Package for new Mister Car Wash building.
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/09/2025 | SITE - Stormwater Setup and Controls | N/A | Complete (Recurring) | Contractor needs to put wattles around all the spoiled piles. Needs to put more track out rock in the entrance of the project. |
| 07/31/2025 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | I had to contractor add more wattles along the fence line along the south end of the project |
| 10/30/2025 | SITE | N/A | Not Ready | Contractor has not started on the basins yet and the water harvesting area |
| 12/10/2025 | COT - ENGR - Stormwater | N/A | Partial Pass | I met with a contractor and I met with a dot out on site about the tap in into the 60 inch CMP pipe storm drain. The architect drew up a design so the water would flow into the 66 inch Storm drain properly.ADDOT. approved it. I informed the contractor to go ahead and backfill it |
| 12/12/2025 | ENGR Paving | N/A | Not Ready | Reschedule inspection for early morning. |
| 12/09/2025 | ENGR Grading Final | N/A | Partial Pass | engineering is going to come up with a design for the connection of the pipe contractor will forward the design to the City Of Tucson |
Completed Inspections
Permit Status: Issued
Permit Number: TD-DEV-1223-00492
Permit Description: Revision 3 - Development Package for new Mister Car Wash building.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/02/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | informed the contractor that he needs to call in every two weeks for swppp . To install the track out rock and to have a full set of plants on site. Informed him that all materials will be tested and reviewed. | |
| 10/22/2025 | Passed | Contractor is good to backfill the 6 inch storm drain pipe coming from the building to the main storm drain on the southwest side. Also good to backfill the 4 inch pipe that comes off the roof into the storm drain on the south east side. |
Scheduled Inspections
Scheduled Inspections - TD-DEV-1223-00492
Status: Issued
Description: Revision 3 - Development Package for new Mister Car Wash building.
| Scheduled Date | Description | Entered By | Entered Date |
|---|---|---|---|
| 12/15/2025 | ENGR Grading Final | Scheduled |
For information about today’s scheduled inspections please refer to the
PDSD Daily Inspections Dashboards (Desktop)