Inspection Status: Not Ready
Inspection History
| Date |
Description |
Inspector |
Results |
Comments |
| 08/12/2025 |
|
|
Not Ready |
Contractor informed me that they don’t have a permit from a dot yet. |
| 10/22/2025 |
|
|
Passed |
Contractor is good to backfill the 6 inch storm drain pipe coming from the building to the main storm drain on the southwest side. Also good to backfill the 4 inch pipe that comes off the roof into the storm drain on the south east side. |