Inspection Status: Partial Pass
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/30/2025 |
ENGR Grading Final |
|
Partial Pass |
grading on the south end of the building is good to pour concrete. I inspected the trash enclosure. It’s not built per plan.. |
| 12/09/2025 |
ENGR Grading Final |
|
Partial Pass |
engineering is going to come up with a design for the connection of the pipe contractor will forward the design to the City Of Tucson |
| 12/15/2025 |
ENGR Grading Final |
|
Not Ready |
Contractor, not ready. Will reschedule on Wednesday. |
| 12/16/2025 |
ENGR Grading Final |
|
Partial Pass |
Contractor can pour the concrete drive on the north east side and on the west side |
| 12/22/2025 |
ENGR Grading Final |
|
Passed |
|