Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Development Package
Address NEW:
3300 N FAIRVIEW AV
Apply Date:
12/21/2023
Applicant:
Benjamin Sellers
Description:
Restricted Access - Revision 1 - updates to overall plan, started 11.26.2025 ** This City project includes upgrades to the existing 38.25 acres Jacobs Park which proposes new softball diamonds, new pickleball courts, a multi-use court, new dog park, new restroom, new sports lighting, new perimeter asphalt path, and upgrades to existing playground surfacing, pool/splash pad fencing, irrigation renovations and a reduction in turf.

Permit Reviews

Permit Number - TD-DEV-1223-00486
Permit Status: Issued
Permit Description: Restricted Access - Revision 1 - updates to overall plan, started 11.26.2025 ** This City project includes upgrades to the existing 38.25 acres Jacobs Park which proposes new softball diamonds, new pickleball courts, a multi-use court, new dog park, new restroom, new sports lighting, new perimeter asphalt path, and upgrades to existing playground surfacing, pool/splash pad fencing, irrigation renovations and a reduction in turf.
Start Date Submittal Complete Date Status  
11/26/2025 DEVELOPMENT PACKAGE NEW REVISION v.1 12/05/2025 REQUIRES RESUBMIT Review Details
12/05/2025 DEVELOPMENT PACKAGE NEW REVISION v.2 12/08/2025 APPROVED Review Details
05/20/2024 DEVELOPMENT PACKAGE NEW v.3 05/28/2024 APPROVED Review Details
03/12/2024 DEVELOPMENT PACKAGE NEW v.2 04/26/2024 REQUIRES RESUBMIT Review Details
01/05/2024 DEVELOPMENT PACKAGE NEW v.1 01/25/2024 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: TD-DEV-1223-00486
Permite Description: Restricted Access - Revision 1 - updates to overall plan, started 11.26.2025 ** This City project includes upgrades to the existing 38.25 acres Jacobs Park which proposes new softball diamonds, new pickleball courts, a multi-use court, new dog park, new restroom, new sports lighting, new perimeter asphalt path, and upgrades to existing playground surfacing, pool/splash pad fencing, irrigation renovations and a reduction in turf.
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
05/28/2025 PDSD Engineering Division Pre-Construction SITE N/A Deferred
11/10/2025 SITE - Sign Footer/Setback/Excavation Layout/Rebar N/A Not Applicable
01/21/2026 N/A Partial Pass All 6 inch and 4 inch mainline reclaimed irrigation pipe on pages L4.3 and L4.4 is in place and correct to plan with poly plastic and thrust blocks in place at joints and angles per plan. OK to shade these main lines and begin backfilling before pressure test of mainline control wires and tape will be in place when finished backfilling. Trench is correct to plan.
03/16/2026 For trash and recycling enclosures N/A Partial Pass 3/16/26 SW Material Enclosers-Reinforcing correct to top of walls. Grout all reinforced cells and including bond beams with vibrator.
09/17/2026 Consultation SITE N/A Partial Pass Discussed truncated dome installation. Field change made at south driveway to ensure accessibility compliance. Confirmed acceptance from P&R PM
Joe Barr
03/10/2026 N/A Partial Pass contractor can pour about 150 lineal feet of sidewalk on the west side of the park
I also stayed around for the weekly meeting
10/16/2026 ENGR Grading Final N/A Partial Pass There are 9" water harvesting basins shown in plan and noted in Keynote 42 of DP Site plan that were not built. PDSD Engineering needs a note from Parks and Recreation accepting the deviations from the plan.

Completed Inspections

Permit Status: Issued
Permit Number: TD-DEV-1223-00486
Permit Description: Restricted Access - Revision 1 - updates to overall plan, started 11.26.2025 ** This City project includes upgrades to the existing 38.25 acres Jacobs Park which proposes new softball diamonds, new pickleball courts, a multi-use court, new dog park, new restroom, new sports lighting, new perimeter asphalt path, and upgrades to existing playground surfacing, pool/splash pad fencing, irrigation renovations and a reduction in turf.
Total Completed Inspections - 3
Date Description Inspector Results Comments
10/16/2026 Passed
10/16/2026 LAND Landscape Appearance & Function Final Passed
10/16/2026 COT - ENGR - Signage Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
LAST APPROVED SITE PLAN - APPROVED 250520-JACOBS-DP RESUBMITTAL_V3_V1.PDF DOCUMENTS VIEW
JACOBS COMMENT RESPONSE_V2.PDF DOCUMENTS VIEW
JACOBS GEOTECH REPORT-RESUBMITTAL_V2_V1.PDF DOCUMENTS VIEW
JACOBS PARK DRAINAGE MEMO_V1.PDF DOCUMENTS VIEW
JACOBSPARK-COMMENT RESPONSE_V1.PDF DOCUMENTS VIEW
JACOBSPARK-DPSET_V2.PDF DOCUMENTS VIEW
JACOBSPARK-NPPOEXEMPTION_APPLICATION_V1.PDF DOCUMENTS VIEW
APPROVED RESPONSE LETTER.PDF DOCUMENTS VIEW
FACILITIES MAP.PDF DOCUMENTS VIEW