Permit Details

Status:
Inspections
Type:
Development Package
Address:
401 E 22ND ST
Address NEW:
401 E 22ND ST
Apply Date:
12/04/2023
Applicant:
Daniel Sharp
Description:
Restricted Access - *Revision #1 (fencing and new concrete) started 7/19/24* New Splash Pad, play equipment, comfort station, multi-use paths and parking areas. Improvements to Existing baseball facilities.

Permit Reviews

Permit Number - TD-DEV-1223-00473
Permit Status: Inspections
Permit Description: Restricted Access - *Revision #1 (fencing and new concrete) started 7/19/24* New Splash Pad, play equipment, comfort station, multi-use paths and parking areas. Improvements to Existing baseball facilities.
Start Date Submittal Complete Date Status  
12/04/2023 DEVELOPMENT PACKAGE NEW v.1 01/17/2024 REQUIRES RESUBMIT Review Details
01/07/2025 DEVELOPMENT PACKAGE NEW REVISION v.2 01/07/2025 APPROVED Review Details
06/10/2024 DEVELOPMENT PACKAGE NEW v.3 06/17/2024 APPROVED Review Details
11/13/2024 DEVELOPMENT PACKAGE NEW REVISION v.1 12/05/2024 REQUIRES RESUBMIT Review Details
05/10/2024 DEVELOPMENT PACKAGE NEW v.2 05/17/2024 REQUIRES RESUBMIT Review Details
07/19/2024 DEVELOPMENT PACKAGE NEW v.1 08/09/2024 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Inspections
Permit Number: TD-DEV-1223-00473
Permite Description: Restricted Access - *Revision #1 (fencing and new concrete) started 7/19/24* New Splash Pad, play equipment, comfort station, multi-use paths and parking areas. Improvements to Existing baseball facilities.
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
09/18/2025 SITE - Sign Footer/Setback/Excavation Layout/Rebar N/A Canceled
09/29/2025 N/A Partial Pass 9/29/25
S Parking Lot Subgrade
Submit compaction Reports to portal. Grade is correct to whiskers and survey hubs sufficient. Curb and header reveals are correct. Curbs will be marked for correct AB Grade. Okay to place AB in parking lot.

Call us back out to look at AB in parking lot when ready.

Submit compaction report in subgrade for scupper floors to west of perking lot. Call us in to inspect Scuppers before pouring them.

Call in Intermediate Grading inspection when ready- When basins, swales and the cross section profiles in plan and other drainage features are cut.
10/01/2025 N/A Partial Pass 5 PAG type A bollards in planter areas of North parking lot -footings are correct to pour.
8 PAG type A bollards in planter areas of South parking lot -footings are correct to pour.
10/27/2025 ENGR Paving N/A Partial Pass Okay to begin AC paving installation at south parking area
10/31/2025 N/A Partial Pass 10/31/25- 4" Main for Fields 2 and 3 that extends up to end east of Field 3. Connects to existing main south of Skate park. No sleeving necessary. Trenching, bedding is correct to detail IR 2.3 detail 1. Okay to shade with bedding and backfill with native as needed when ready.
10/16/2025 N/A Canceled

Completed Inspections

Permit Status: Inspections
Permit Number: TD-DEV-1223-00473
Permit Description: Restricted Access - *Revision #1 (fencing and new concrete) started 7/19/24* New Splash Pad, play equipment, comfort station, multi-use paths and parking areas. Improvements to Existing baseball facilities.
Total Completed Inspections - 1
Date Description Inspector Results Comments
04/24/2025 PDSD Engineering Division Pre-Construction SITE Passed No native protected plants on site. Waive NPPO.
Site is Fenced and Secure.

Documents

File Name Document Type  
HISTORIC SUBCOMMITTEE REVIEW SLIDES_V1.PDF DOCUMENTS VIEW
2_DP SANTA RITA PARK_V2.PDF PLANS UNDER REVIEW VIEW
2_COMMENT RESPONSE LETTER_V1.PDF PLANS UNDER REVIEW VIEW