Inspection History: SITE - Sign Footer/Setback/Excavation Layout/Rebar

Date Description Inspector Results Comments
01/28/2026 SITE - Sign Footer/Setback/Excavation Layout/Rebar Canceled
04/14/2026 SITE - Sign Footer/Setback/Excavation Layout/Rebar Partial Pass Reinforcing and dimensions correct, spacing good, ground good. Pipes wrapped. Okay to pour wall footer of pump house. Be advised to call inspections on the building permit when the details are on the building permit.
04/24/2026 SITE - Sign Footer/Setback/Excavation Layout/Rebar Partial Pass Okay to pour masonry footing for valve enclosure.
05/12/2026 SITE - Sign Footer/Setback/Excavation Layout/Rebar Partial Pass 13.5' x 9.5' x 12" thick Electrical slab w/ 12" OC #4 BW. Bent bar at edges 6" w/24" splice. Ground in place clamped to mat. Subgrade compacted. Clearances good. Okay to pour.
09/11/2025 SITE - Sign Footer/Setback/Excavation Layout/Rebar Partial Pass 9/11/25
5 Light pole Footers At S parking lot. 2' dia footers 6' below grade 3' above with form. Reinforcing correct to plan. Ground correct.
1 light pole in middle of lot needs to centered better in form. 1 at SE corner needs dirt removed for correct clearance to rebar. Provide pictures before Pouring. Okay to pour.
09/12/2025 SITE - Sign Footer/Setback/Excavation Layout/Rebar Partial Pass 9/12/25
Five light pole footers At North Parking lot. Footers are correct with reinforcing and dimensions. Placement with survey is correct. Ground wire coils will be put in before pouri due to theft considerations. Jake will provide me with photographs of ground wire. Ok to pour light pole footers.
09/18/2025 SITE - Sign Footer/Setback/Excavation Layout/Rebar Canceled