Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: SITE - Sign Footer/Setback/Excavation Layout/Rebar
Permit Number - TD-DEV-1223-00473
Inspection Description - SITE - Sign Footer/Setback/Excavation Layout/Rebar
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/11/2025 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | Partial Pass | 9/11/25 5 Light pole Footers At S parking lot. 2' dia footers 6' below grade 3' above with form. Reinforcing correct to plan. Ground correct. 1 light pole in middle of lot needs to centered better in form. 1 at SE corner needs dirt removed for correct clearance to rebar. Provide pictures before Pouring. Okay to pour. |
|
| 09/12/2025 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | Partial Pass | 9/12/25 Five light pole footers At North Parking lot. Footers are correct with reinforcing and dimensions. Placement with survey is correct. Ground wire coils will be put in before pouri due to theft considerations. Jake will provide me with photographs of ground wire. Ok to pour light pole footers. |
|
| 09/18/2025 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | Canceled |