Permit Details

Status:
Inspections
Type:
Development Package
Address:
502 S FREMONT AV
Address NEW:
502 S FREMONT AV
Apply Date:
12/01/2023
Applicant:
Jesus Lozano
Description:
Development Package for Multifamily Triplex Building

Permit Reviews

Permit Number - TD-DEV-1223-00472
Permit Status: Inspections
Permit Description: Development Package for Multifamily Triplex Building
Start Date Submittal Complete Date Status  
04/08/2025 DEVELOPMENT PACKAGE NEW v.5 04/25/2025 APPROVED Review Details
12/26/2023 DEVELOPMENT PACKAGE NEW v.2 01/26/2024 REQUIRES RESUBMIT Review Details
11/08/2024 DEVELOPMENT PACKAGE NEW v.3 01/30/2025 REQUIRES RESUBMIT Review Details
02/19/2025 DEVELOPMENT PACKAGE NEW v.4 03/17/2025 REQUIRES RESUBMIT Review Details
12/04/2023 DEVELOPMENT PACKAGE NEW v.1 12/12/2023 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TD-DEV-1223-00472
Permit Status: Inspections
Permit Description: Development Package for Multifamily Triplex Building
Total Outstanding Activity Conditions - 1
Date Name
10/02/2025 CRWHPLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT

Outstanding Inspections

Permit Status: Inspections
Permit Number: TD-DEV-1223-00472
Permite Description: Development Package for Multifamily Triplex Building
Total Outstanding Inspections - 9
Last Inspection Date Description Inspector Results Comments
08/20/2025 Assurance - Initial (Roadways, Utilities, Basins) ENGR N/A Not Applicable There is no assurance or basins on this site.
06/12/2026 Consultation SITE N/A Not Applicable
07/01/2026 ENGR Engineering Final N/A Re-inspection required (with fee) Three (3) sidewalks on north side are too steep, up to 15% running slope. These need to be 5% max without a railing or 8.33% max with a railing. These routes are indicated as the refuse container path for each unit. Scuppers have been excluded on the north side, pavers have been installed instead. The backup spur in the parking area is 18 inches shorter than the plan calls for. Walls have been excluded from this project.
A revised plan reflecting the changes needs to be submitted and approved.
Tree stakes are not complete, bike parking is not in place, parking stripes and parking stops are not in place.
07/01/2026 ENGR Paving N/A Re-inspection required (with fee) Backup Spur isn’t per plan. parking blocks are missing, AB was not inspected.
07/01/2026 SITE - Zoning Final N/A Re-inspection required 7/1/26 - Three (3) sidewalks on north side are too steep, up to 15% running slope. These need to be 5% max without a railing or 8.33% max with a railing. These routes are indicated as the refuse container path for each unit. Scuppers have been excluded on the north side, pavers have been installed instead. The backup spur in the parking area is 18 inches shorter than the plan calls for. Walls have been excluded from this project.
A revised plan reflecting the changes needs to be submitted and approved.
07/01/2026 N/A Re-inspection required (with fee) 7/1/26 - Three (3) sidewalks on north side are too steep, up to 15% running slope. These need to be 5% max without a railing or 8.33% max with a railing. These routes are indicated as the refuse container path for each unit. Scuppers have been excluded on the north side, pavers have been installed instead. The backup spur in the parking area is 18 inches shorter than the plan calls for. Walls have been excluded from this project.
A revised plan reflecting the changes needs to be submitted and approved.
07/01/2026 LAND Landscape Appearance & Function Final N/A Re-inspection required (with fee) 7/1/26 - Three (3) sidewalks on north side are too steep, up to 15% running slope. These need to be 5% max without a railing or 8.33% max with a railing. These routes are indicated as the refuse container path for each unit. Scuppers have been excluded on the north side, pavers have been installed instead. The backup spur in the parking area is 18 inches shorter than the plan calls for. Walls have been excluded from this project.
A revised plan reflecting the changes needs to be submitted and approved.
07/01/2026 N/A Re-inspection required (with fee) Striping, bike parking, and pedestrian circulation are not complete.
07/01/2026 N/A Re-inspection required (with fee) 7/1/26 - Three (3) sidewalks on north side are too steep, up to 15% running slope. These need to be 5% max without a railing or 8.33% max with a railing. These routes are indicated as the refuse container path for each unit. Scuppers have been excluded on the north side, pavers have been installed instead. The backup spur in the parking area is 18 inches shorter than the plan calls for. Walls have been excluded from this project.
A revised plan reflecting the changes needs to be submitted and approved.

Completed Inspections

Permit Status: Inspections
Permit Number: TD-DEV-1223-00472
Permit Description: Development Package for Multifamily Triplex Building
Total Completed Inspections - 1
Date Description Inspector Results Comments
07/08/2025 PDSD Engineering Division Pre-Construction SITE Passed Project has just started, they are doing their underground on the building. Wattle should be used on the street side of the project. Not sure if Jesus understands everything that needs to be called in for inspections. Paperwork was handed out as far as an inspection list. Address needs to also be put up.

Documents

File Name Document Type  
APPROVED_FREMONT_DDO-24-106 DECISION_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
FINAL_DEVELOPMENT_PACKAGE_ PLAN_FREMONT_V4.PDF DOCUMENTS VIEW
FREMONT DP MARCH 2025_V5.PDF DOCUMENTS VIEW
DDO-24-106 DECISION.PDF SPECIAL APPLICATIONS VIEW