Address Search: 502 S FREMONT AV
Search
Parcel Attributes
| Parcel | 124130260 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | R-3 |
| Tucson Ward | Ward 5 |
| Tucson Registered Neighborhood | Barrio San Antonio |
| National Register Historic District | Barrio San Antonio Historic District |
| Structure on National Register of Historic Places | Contributor |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 502 S FREMONT AV
Date - 10/24/2026 12:03 p.m.
Total Number Of Annexations & Original City Zoning (1)
| Plan | Description | Annexation Ordinance | Effective Date | OCZ Ordinance |
|---|---|---|---|---|
| 3/4 Mile East To Campbell Avenue | 486 |
Rezoning Cases
Date - 10/24/2026 12:03 p.m.
Total Number Of Rezone Cases - (1)
| Case No. | Description | New Zone | Status | Status Date |
|---|---|---|---|---|
| C9-20-11 | Sunshine Mile UOD | Ordinanced | 10/20/2020 |
Permits
Address: 502 S FREMONT AV
Date - 10/24/2026 12:03 p.m.
Total Number Of Permits - (11)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-COM-1223-02769 | Complete | 12/01/2023 | 08/27/2027 | Commercial Building | SUBMITTING SITE PLAN, FLOOR PLAN AND ELEVATION REQUESTING ZONING AND ENGINEERING REVIEW TO REQUEST A DDO FOR THIS PROJECT. (Development Package has been applied for separately) | |
| TD-DEV-1223-00472 | Complete | 12/01/2023 | 08/27/2029 | Development Package | Rev 1 Development Package for Multifamily Triplex Building | |
| TF-FCP-1025-00888 | Complete | 10/08/2025 | 05/12/2026 | Fire Construction Permit | FIRE SPRINKLER SYSTEM | |
| TC-DMO-0923-00192 | Issued | 09/06/2023 | 05/19/2024 | Demolition Permit | COMPLETE DEMOLITION OF EXISTING RESIDENCE, CARPORT, PATIO WALL AND ACCESORY STRUCTURES. | |
| TR-ROW-0925-01078 | Complete | 09/02/2025 | 10/10/2025 | Right-of-Way (ROW) | remove/replace 180SF of asphalt (1) 4" sewer tap on 8: VCP (1) 40LF of 4" SDR 35 sewer pipe from sewer line to 5' inside of property | |
| TR-ROW-0426-00453 | Complete | 04/20/2026 | 06/12/2026 | Right-of-Way (ROW) | The project provides a single continuous ADA-compliant accessible route connecting the public sidewalk along S Fremont Ave to the building entrance. 05/20/26- a revision page and traffic control was send for revision. | |
| TR-UTL-0226-00241 | Complete | 02/09/2026 | 03/18/2026 | Right-of-Way (ROW) - Utility | Installing a 4" Fire Protection Service, 3-1" water services with 3/4" Meters, and 1 system abandonment | |
| TR-UTL-0226-00229 | Complete | 02/06/2026 | 03/07/2026 | Right-of-Way (ROW) - Utility | wo#3145891 502 s fremont ave 14-14-18 nw repair leaking hydrant at the northeast corner of the lot in dirt area 6lf/ar | |
| T20RW05130 | FINAL | 09/21/2020 | 09/26/2020 | ROW | 20R2400 REPAIR LEAKING MAIN @ 6LF., "EMERGENCY AFTER THE FACT PERMIT" | |
| T22RW01738 | FINAL | 05/04/2022 | 06/03/2022 | ROW | WO# 22R1086 REPAIR LEAKING MAIN@6 LF IN THE INTERSECTION OF S.FREMONT AVE AND E 14TH ST. EMERGENCY AFTER THE FACT ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. | |
| T97BU00154 | FINAL | 03/11/1997 | 10/27/1997 | BUILD | ADDITION:STORAGE SHED STARTED W/OUT PERMITS |
Plans
Address: 502 S FREMONT AV
Date - 10/24/2026 12:03 p.m.
Total Number Of Plans - (3)
| Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-BCA-0425-00018 | Complete | 04/08/2025 | N/A | -- Building Code Appeal | Development Package for Multifamily Triplex Building | |
| TP-PRE-0923-00324 | Complete | 09/20/2023 | N/A | -- Pre-Application Conference | Development Plan (Proposed Triplex) | |
| TW-CWH-0826-00028 | Inactive | 08/28/2026 | N/A | -- Commercial Water Harvesting Ordinance | Rev 1 Development Package for Multifamily Triplex Building CRWH PLAN CREATED Changed to Inactive status because there is no IR meter onsite and no plant water demand table included in plans, so unable to determine if water use is in compliance (Candice Rupprecht - 9.28.26) |