Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
10001 S WILMOT RD
Apply Date:
12/08/2022
Applicant:
Brad Davis
Description:
REV 1 - Drainage, light updates; New Virtual Training Facility and 300 yard Shooting Range. Shooting Range has a two story free standing shooting platform as well as a shade canopy to cover grade level shooting positions.

Permit Reviews

Permit Number - TD-DEV-1222-00073
Permit Status: Complete
Permit Description: REV 1 - Drainage, light updates; New Virtual Training Facility and 300 yard Shooting Range. Shooting Range has a two story free standing shooting platform as well as a shade canopy to cover grade level shooting positions.
Start Date Submittal Complete Date Status  
03/29/2023 DEVELOPMENT PACKAGE REVIEW v.2 11/01/2023 APPROVED Review Details
12/15/2022 DEVELOPMENT PACKAGE REVIEW v.1 03/02/2023 REQUIRES RESUBMIT Review Details
07/03/2025 DEVELOPMENT PACKAGE NEW REVISION v.1 08/06/2025 APPROVED Review Details

Conditions

Permit Number - TD-DEV-1222-00073
Permit Status: Complete
Permit Description: REV 1 - Drainage, light updates; New Virtual Training Facility and 300 yard Shooting Range. Shooting Range has a two story free standing shooting platform as well as a shade canopy to cover grade level shooting positions.
Date Description Comments
08/06/2025 Prior to Final- all documents, fees and contractor must be added and or paid.

Outstanding Inspections

Permit Status: Complete
Permit Number: TD-DEV-1222-00073
Permite Description: REV 1 - Drainage, light updates; New Virtual Training Facility and 300 yard Shooting Range. Shooting Range has a two story free standing shooting platform as well as a shade canopy to cover grade level shooting positions.
Total Outstanding Inspections - 9
Last Inspection Date Description Inspector Results Comments
11/08/2023 PDSD Site/Engineering Division - Landscaping N/A Not Ready
11/08/2023 SITE - SWPPP Correction Notice N/A Not Ready
08/06/2024 SITE - Stormwater Setup and Controls N/A Complete (Recurring) No work has been started as of yet, Pre-Con is needed before any work is started on site.
01/05/2024 ENGR Grading Final N/A Not Ready No work has started at this time. I contacted Donna MARTES with GLH in at (520) 609-0604. She advised me that no work has been contracted at this time. She will provide us additional information next week in regards to if the contract has been issued to a private contractor, so that the work can be started.
11/15/2024 SITE - Stormwater Follow-up N/A Complete (Recurring)
04/30/2025 LAND Landscape Appearance & Function Final N/A Not Ready Landscape Final not ready: 2 Peniocereus greggii need to be replaced and planted per plan detail 3 on pg L1.1. Metal ties need removed from Ocotillos.
04/30/2025 SITE - Stormwater Final Inspection N/A Canceled
02/11/2025 PDSD Site/Engineering Division - NPPO N/A Canceled
05/09/2025 Final inspection to ensure all landscape and water harvesting SITE N/A Canceled

Completed Inspections

Permit Status: Complete
Permit Number: TD-DEV-1222-00073
Permit Description: REV 1 - Drainage, light updates; New Virtual Training Facility and 300 yard Shooting Range. Shooting Range has a two story free standing shooting platform as well as a shade canopy to cover grade level shooting positions.
Total Completed Inspections - 11
Date Description Inspector Results Comments
08/21/2024 PDSD Engineering Division Pre-Construction SITE Passed After walking the site we went over all necessary inspections that will be coming up.
Covered the nursery area and fence protection around that, that will be needed as this is still open range.
On the site itself a temporary fence or the installation of the permeant fence will be needed.
Area is pretty wide open so all protected plants are highly visible.
Water is coming from a nearby hydrant.
Dust control will be important.
Once trucks start rolling in with the dirt from the Blackhawk project there will be a substantial stockpile until used.
A plan will have to be implemented for how to keep the 3' sand topping in place on the range berms. This sand is basically like beach sand and has very little stability on it's own and these are 1 to 1 slopes.
09/11/2024 Verify required native plant protection, relocation, removal is completed prior to activity on job site Passed All scheduled NPPO to move has been and has been fenced in to protect while construction is in progress.
10/03/2024 NPPO Pre-Construction Passed NPPO has been placed and is in good condition, watering is being done as specified by the landscaper
10/16/2024 COT - ENGR - Stormwater Passed Drainage structure for down spouts
12/09/2024 ENGR Grading Final Passed Grading final looks to be consistent with plans. Slopes on backstops look good at grade.
01/13/2025 Consultation SITE Passed This inspection was for pier/columns for the over head shooting cover. Good to pour built to plan.
04/30/2025 SITE - Zoning Final Passed No issues noted so this is a pass
05/09/2025 PDSD Site/Engineering Division - NPPO Passed Plants have been replaced
05/14/2025 COT - FCON - Fire - Final Passed
08/14/2025 ENGR - Drainage Structures Passed
08/14/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW