Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - TD-DEV-1222-00073
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/06/2024 | PDSD Engineering Division Pre-Construction SITE | Not Ready | Pre-Con meeting is to be completed before any work has been started on site. | |
08/21/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | After walking the site we went over all necessary inspections that will be coming up. Covered the nursery area and fence protection around that, that will be needed as this is still open range. On the site itself a temporary fence or the installation of the permeant fence will be needed. Area is pretty wide open so all protected plants are highly visible. Water is coming from a nearby hydrant. Dust control will be important. Once trucks start rolling in with the dirt from the Blackhawk project there will be a substantial stockpile until used. A plan will have to be implemented for how to keep the 3' sand topping in place on the range berms. This sand is basically like beach sand and has very little stability on it's own and these are 1 to 1 slopes. |
|
11/08/2023 | PDSD Engineering Division Pre-Construction SITE | Not Ready |