Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - TD-DEV-1222-00073
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/30/2025 | ENGR Engineering Final | Not Ready | All rails need to be at 42" per code. The roof shooting area is in need of being raised to meet this code in 2 areas. Also there is a possible 6" step area that would further create a safety hazard. Please mark this as (a non standing and step area). | |
| 05/01/2025 | ENGR Engineering Final | Not Ready | See attached | |
| 05/14/2025 | ENGR Engineering Final | Partial Pass | 05/14/25, PARTIAL PASS, RANGE ONLY. This INSPECTION will be used for range use only. Range will now be considered hot and in use. This does not apply to the new training room and or the water harvesting area. Water harvesting now has not been built per plan. Sidewalk is not in place on the building per plan. | |
| 07/02/2025 | ENGR Engineering Final | Not Ready | 07/02/25, Parking blocks still need to be installed to show the location of the parking area at the range as per planned. | |
| 08/14/2025 | ENGR Engineering Final | Passed |