Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: ENGR - Drainage Structures
| Date |
Description |
Inspector |
Results |
Comments |
| 01/07/2025 |
ENGR - Drainage Structures |
|
Not Ready |
Drainage Ditch and structure needs to be stabilized by some means to prevent loose dirt from going into the 13" drainage pipe and creating a clogging situation on heavy rains. Please submit a review showing the solution. |
| 04/30/2025 |
ENGR - Drainage Structures |
|
Not Ready |
04/30/25, At the downspout from range roof structure, it looks like a hole was dug for drainage, this is creating a catch basin at the bottom of the downspout and even on the water test it has started undermining the slab. Please correct this for positive drainage away from slab and structure. |
| 05/14/2025 |
ENGR - Drainage Structures |
|
Not Ready |
05/14/25, water harvesting at building location not built per plan. |
| 07/02/2025 |
ENGR - Drainage Structures |
|
Not Ready |
07/02/25, the revision for the change in the basin/water harvesting area still needs to be completed. |
| 08/14/2025 |
ENGR - Drainage Structures |
|
Passed |
|
| 09/16/2024 |
ENGR - Drainage Structures |
|
Partial Pass |
Thermoplastic drain pipe at end of shooting range in front of the rear berm |
| 11/12/2024 |
ENGR - Drainage Structures |
|
Passed |
|