Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
11/18/2022
Applicant:
Chuck Martin
Description:
*As Built #1 (building sq. footage updated) started 1/30/24* Tentative Plat to create two new lots at existing shopping center.

Permit Reviews

Permit Number - TD-DEV-1122-00049
Permit Status: Complete
Permit Description: *As Built #1 (building sq. footage updated) started 1/30/24* Tentative Plat to create two new lots at existing shopping center.
Start Date Submittal Complete Date Status  
01/30/2024 AS-BUILT v.1 02/07/2024 APPROVED Review Details
06/26/2023 DEVELOPMENT PACKAGE REVIEW v.2 07/07/2023 REQUIRES RESUBMIT Review Details
11/14/2023 DEVELOPMENT PACKAGE NEW v.1 01/23/2024 APPROVED Review Details
10/02/2023 DEVELOPMENT PACKAGE REVIEW v.3 10/31/2023 REQUIRES RESUBMIT Review Details
12/05/2022 DEVELOPMENT PACKAGE REVIEW v.1 01/09/2023 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TD-DEV-1122-00049
Permite Description: *As Built #1 (building sq. footage updated) started 1/30/24* Tentative Plat to create two new lots at existing shopping center.
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
05/06/2024 ENGR - Drainage Structures N/A Partial Pass Contractor needs to vertical rebar is timber for on each end and three verticals in the corner and two at the center point other than that you’re ready to pour
08/21/2024 N/A Partial Pass Contractors good to grout at the 4 foot mark for the trash and closure
11/08/2024 COT - FCON - Fire - Final N/A Not Applicable
11/08/2024 ENGR Engineering Final N/A Re-inspection required Move the van accessible sign to the left post
Either remove and fix ramp that measured at 7.4% or add rails to both sides
Water harvesting islands grade needs to be 6 to 9" below asphalt at saw cut
Add one water harvesting cut next to the right side of dumpster enclosure
West side move fence to building
East side move fence to rear of trash enclosure

Completed Inspections

Permit Status: Complete
Permit Number: TD-DEV-1122-00049
Permit Description: *As Built #1 (building sq. footage updated) started 1/30/24* Tentative Plat to create two new lots at existing shopping center.
Total Completed Inspections - 9
Date Description Inspector Results Comments
01/25/2024 PDSD Engineering Division Pre-Construction SITE Passed
07/24/2024 Consultation SITE Passed This inspection was for light pole caissons and rebar. Also discussed was the perimeter fencing at Starbucks.
08/05/2024 For trash and recycling enclosures Passed
11/08/2024 COT - ENGR - Signage Final Passed
11/08/2024 LAND Landscape Appearance & Function Final Passed
12/12/2024 ENGR Paving Passed
12/12/2024 Passed
12/12/2024 Passed
01/21/2025 ENGR Engineering Final Passed Starbucks has taken over the following; dumpster, fencing, Conex boxes. These items are no longer the responsibility of the developer on this site.
Starbucks on the development side is completed.
Angies lobster is complete on both the development side and building.

Documents

File Name Document Type  
COFT - PDSD - UPDATED PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
APPROVED_5192 DP AS BUILT 11-29-24_V1.PDF DOCUMENTS VIEW