Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Canceled
Inspection History: ENGR - Drainage Structures
| Date |
Description |
Inspector |
Results |
Comments |
| 03/26/2024 |
ENGR - Drainage Structures |
|
Canceled |
|
| 05/06/2024 |
ENGR - Drainage Structures |
|
Partial Pass |
Contractor needs to vertical rebar is timber for on each end and three verticals in the corner and two at the center point other than that you’re ready to pour |