Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Canceled

Inspection History: ENGR - Drainage Structures

Date Description Inspector Results Comments
03/26/2024 ENGR - Drainage Structures Canceled
05/06/2024 ENGR - Drainage Structures Partial Pass Contractor needs to vertical rebar is timber for on each end and three verticals in the corner and two at the center point other than that you’re ready to pour