Inspection History Details
Inspection Status: Partial Pass
Inspection History
Permit Number - TD-DEV-1122-00049
Inspection Description -
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/13/2024 | Partial Pass | Courtyard wall at rear of the Starbucks, wall at rear location of building. 6210 E. Broadway. | ||
06/21/2024 | Not Ready | The contractor, his schedule, this inspection for the trash and closure, but didn’t know what item to use. Currently, they are placing the rebar for the floor slab within the structure, but have not completed the installation of the form boards for the pouring. The contractor will call this in next week when he is completed and ready for an inspection and this time he will use the trash enclosure item as noted in his inspections. | ||
08/14/2024 | Partial Pass | Footing inspection for trash enclosure at 110 S. Wilmot | ||
08/21/2024 | Partial Pass | Contractors good to grout at the 4 foot mark for the trash and closure | ||
08/23/2024 | Partial Pass | Pre grout and rebar inspection, wall ready to grout | ||
08/27/2024 | Complete (Recurring) | This was for the start of the drive through concrete pour. | ||
08/29/2024 | Partial Pass | Refuse enclosure slab on the 2nd building. | ||
09/19/2024 | Partial Pass | Contractor installed wire mesh in the drives to new area so Lake poor Concord looks good | ||
Scheduled |