Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - TD-DEV-1122-00049
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/21/2025 | ENGR Engineering Final | Passed | Starbucks has taken over the following; dumpster, fencing, Conex boxes. These items are no longer the responsibility of the developer on this site. Starbucks on the development side is completed. Angies lobster is complete on both the development side and building. |
|
11/08/2024 | ENGR Engineering Final | Re-inspection required | Move the van accessible sign to the left post Either remove and fix ramp that measured at 7.4% or add rails to both sides Water harvesting islands grade needs to be 6 to 9" below asphalt at saw cut Add one water harvesting cut next to the right side of dumpster enclosure West side move fence to building East side move fence to rear of trash enclosure |
|
12/12/2024 | ENGR Engineering Final | Partial Pass | Partial pass on the Starbucks releasing the development contractor from any additional work needing to be completed. Starbucks still has to finish their work on signage. The lobster shack can have a TCO4 and 2 scuppers still need to be installed for roof drainage on the north side of building. |
|
12/12/2024 | ENGR Engineering Final | Partial Pass | Partial pass on the Starbucks releasing the development contractor from any additional work needing to be completed. Starbucks still has to finish their work on signage. The lobster shack can have a TCO4 and 2 scuppers still need to be installed for roof drainage on the north side of building. |
|
12/24/2024 | ENGR Engineering Final | Passed | okay for C O |