Permit: TD-DEV-1024-00291
Permit Details
Status:
Needs Resubmittal
Type:
Development Package
Address:
3250 E SPEEDWAY BL
Address NEW:
3250 E SPEEDWAY BL
Apply Date:
10/24/2024
Applicant:
Brandy Burke
Description:
Rev 1 - started 09/23/2027 Development Package for a new 2,008sf HTeaO tea bar with a drive-thru
Permit Reviews
Permit Number - TD-DEV-1024-00291
Permit Status: Needs resubmittal
Permit Description: Rev 1 - started 09/23/2027
Development Package for a new 2,008sf HTeaO tea bar with a drive-thru
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/13/2025 | DEVELOPMENT PACKAGE NEW v.3 | 03/26/2025 | REQUIRES RESUBMIT |
| 10/15/2026 | DEVELOPMENT PACKAGE NEW REVISION v.3 | 11/13/2026 | REQUIRES RESUBMIT |
| 05/21/2025 | DEVELOPMENT PACKAGE NEW v.4 | 06/13/2025 | REQUIRES RESUBMIT |
| 09/23/2026 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 09/23/2026 | REQUIRES RESUBMIT |
| 10/30/2024 | DEVELOPMENT PACKAGE NEW v.1 | 11/07/2024 | REQUIRES RESUBMIT |
| 10/01/2026 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 10/08/2026 | REQUIRES RESUBMIT |
| 11/27/2024 | DEVELOPMENT PACKAGE NEW v.2 | 02/03/2025 | REQUIRES RESUBMIT |
| 06/13/2025 | DEVELOPMENT PACKAGE NEW v.5 | 06/13/2025 | APPROVED |
Outstanding Inspections
Permit Status: Needs Resubmittal
Permit Number: TD-DEV-1024-00291
Permite Description: Rev 1 - started 09/23/2027
Development Package for a new 2,008sf HTeaO tea bar with a drive-thru
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/10/2026 | For trash and recycling enclosures | N/A | Partial Pass | Ensure grout is vibrated during installation. okay to grout walls |
| 11/13/2026 | N/A | Partial Pass | Okay to pour drive through on west and north ends. Will verify truncated domes requirements |
Completed Inspections
Permit Status: Needs Resubmittal
Permit Number: TD-DEV-1024-00291
Permit Description: Rev 1 - started 09/23/2027
Development Package for a new 2,008sf HTeaO tea bar with a drive-thru
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/16/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | Pre-construction held onsite. Below are necessary inspections. Next step is "Stormwater Initial" inspection once Stormwater controls are in place. Stormwater Initial, Bi-weekly, Final: for stormwater controls and monitoring Grading Progress, Final: for site grade and water harvesting areas Refuse Enclosure: for dumpster footing, walls, slab, approach Sidewalk/Flatwork: for sidewalks, ramps, concrete work Paving: for sub-grade, AB, asphalt Site Striping: for parking lines Drainage Pipe: for downspouts under drive thru lane Landscape: for plantings and ground cover Irrigation: for system components and lines Site Consultation: for general questions and site visits Engineering Final: for completion of Development Package |
|
| 10/27/2026 | SITE - Stormwater Setup and Controls | Passed | ||
| 10/27/2026 | Consultation SITE | Passed |