Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/16/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | Pre-construction held onsite. Below are necessary inspections. Next step is "Stormwater Initial" inspection once Stormwater controls are in place. Stormwater Initial, Bi-weekly, Final: for stormwater controls and monitoring Grading Progress, Final: for site grade and water harvesting areas Refuse Enclosure: for dumpster footing, walls, slab, approach Sidewalk/Flatwork: for sidewalks, ramps, concrete work Paving: for sub-grade, AB, asphalt Site Striping: for parking lines Drainage Pipe: for downspouts under drive thru lane Landscape: for plantings and ground cover Irrigation: for system components and lines Site Consultation: for general questions and site visits Engineering Final: for completion of Development Package |