Permit: TD-DEV-0924-00264
Permit Details
Status:
Complete
Type:
Development Package
Address:
10290 E TANQUE VERDE RD
Address NEW:
10290 E TANQUE VERDE RD
Apply Date:
09/23/2024
Applicant:
Catherine Atchley
Description:
Proposed development of new Circle K fueling canopy and convenience store.
Permit Reviews
Permit Number - TD-DEV-0924-00264
Permit Status: Complete
Permit Description: Proposed development of new Circle K fueling canopy and convenience store.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/24/2024 | DEVELOPMENT PACKAGE NEW v.1 | 11/13/2024 | REQUIRES RESUBMIT |
| 02/18/2025 | DEVELOPMENT PACKAGE NEW v.4 | 02/20/2025 | APPROVED |
| 12/03/2024 | DEVELOPMENT PACKAGE NEW v.2 | 01/21/2025 | REQUIRES RESUBMIT |
| 02/07/2025 | DEVELOPMENT PACKAGE NEW v.3 | 02/18/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TD-DEV-0924-00264
Permit Status: Complete
Permit Description: Proposed development of new Circle K fueling canopy and convenience store.
| Date | Description | Comments |
|---|---|---|
| 09/09/2025 | CRWH PLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT |
Outstanding Inspections
Permit Status: Complete
Permit Number: TD-DEV-0924-00264
Permite Description: Proposed development of new Circle K fueling canopy and convenience store.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/20/2026 | For trash and recycling enclosures | N/A | Partial Pass | Dumpster enclosure footing excavation and reinforcement are good. Okay to pour footing. |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-0924-00264
Permit Description: Proposed development of new Circle K fueling canopy and convenience store.
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/22/2026 | NPPO Pre-Construction | Passed | NPPO plants are marked and protected in accordance with approved plans. | |
| 01/22/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | 1/22/26 - Site meeting held today. Items that need addressed: install wattle to prevent runoff, stake porta-potties to prevent tipping, post SWPPP signage. Once complete, schedule "Stormwater Initial" inspection. | |
| 02/09/2026 | SITE - Stormwater Setup and Controls | Passed | Prescribed SWPPP measures are in place: wattle along south border, track-out rock. Un-permitted concrete washout at southeast corner needs,to be mitigated. Stockpile at southeast corner needs wattle. SWPPP book needs to be maintained and kept onsite at all times. | |
| 08/06/2026 | ENGR Grading Final | Passed | Locations and dimensions of curbs, sidewalks, and PAALs is correct. Site is graded in accordance with approved plans. |
|
| 08/06/2026 | ENGR Paving | Passed | On-site paving is completed in accordance with approved plans. Striping will be verified on a separate inspection. | |
| 08/06/2026 | Passed | Walls are complete in accordance with approved plans. | ||
| 08/06/2026 | For trash and recycling enclosures | Passed | Refuse enclosure is complete in accordance with approved plans. | |
| 08/11/2026 | NPPO Final | Passed | NPPO items have been preserved as required. | |
| 08/11/2026 | Passed | Finished concrete is within acceptable tolerances. Accessible routes are in compliance with ADA requirements. Pedestrian circulation is completed in accordance with approved plans and has the correct slopes and cross-slopes. |
||
| 08/19/2026 | COT - ENGR - Signage Final | Passed | All on-site traffic control signage including ADA parking are complete in accordance with approved plans. | |
| 08/19/2026 | Passed | Pedestrian circulation is complete in accordance with approved plans. Adequate physical separation to PAAL has been provided. Parking is accurate to plans, bike loops are installed, no EV required for this site. ADA parking and isle has correct measurements and slopes. | ||
| 08/19/2026 | SITE - Stormwater Final Inspection | Passed | Site is complete and secure, SWPPP controls are no longer required. | |
| 08/20/2026 | SITE - Zoning Final | Passed | Scenic landscape border is in tact and cleaned up of garbage and debris. Site is complete in accordance with approved plans. | |
| 08/26/2026 | Passed | Landscape planting is complete in accordance with approved plans. | ||
| 08/26/2026 | ENGR Engineering Final | Passed | Site is complete in accordance with approved development package. | |
| 08/26/2026 | LAND Landscape Appearance & Function Final | Passed | Landscaping, irrigation system, and ground cover is complete in accordance with approved plans. |