Permit: TD-DEV-0924-00264
Permit Details
Status:
Inspections
Type:
Development Package
Address:
10290 E TANQUE VERDE RD
Address NEW:
10290 E TANQUE VERDE RD
Apply Date:
09/23/2024
Applicant:
Catherine Atchley
Description:
Proposed development of new Circle K fueling canopy and convenience store.
Permit Reviews
Permit Number - TD-DEV-0924-00264
Permit Status: Inspections
Permit Description: Proposed development of new Circle K fueling canopy and convenience store.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/24/2024 | DEVELOPMENT PACKAGE NEW v.1 | 11/13/2024 | REQUIRES RESUBMIT |
| 02/18/2025 | DEVELOPMENT PACKAGE NEW v.4 | 02/20/2025 | APPROVED |
| 12/03/2024 | DEVELOPMENT PACKAGE NEW v.2 | 01/21/2025 | REQUIRES RESUBMIT |
| 02/07/2025 | DEVELOPMENT PACKAGE NEW v.3 | 02/18/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TD-DEV-0924-00264
Permit Status: Inspections
Permit Description: Proposed development of new Circle K fueling canopy and convenience store.
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 09/09/2025 | CRWH PLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0924-00264
Permite Description: Proposed development of new Circle K fueling canopy and convenience store.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/20/2026 | For trash and recycling enclosures | N/A | Partial Pass | Dumpster enclosure footing excavation and reinforcement are good. Okay to pour footing. |
Completed Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0924-00264
Permit Description: Proposed development of new Circle K fueling canopy and convenience store.
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/22/2026 | NPPO Pre-Construction | Passed | NPPO plants are marked and protected in accordance with approved plans. | |
| 01/22/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | 1/22/26 - Site meeting held today. Items that need addressed: install wattle to prevent runoff, stake porta-potties to prevent tipping, post SWPPP signage. Once complete, schedule "Stormwater Initial" inspection. | |
| 02/09/2026 | SITE - Stormwater Setup and Controls | Passed | Prescribed SWPPP measures are in place: wattle along south border, track-out rock. Un-permitted concrete washout at southeast corner needs,to be mitigated. Stockpile at southeast corner needs wattle. SWPPP book needs to be maintained and kept onsite at all times. | |
| 08/06/2026 | ENGR Grading Final | Passed | Locations and dimensions of curbs, sidewalks, and PAALs is correct. Site is graded in accordance with approved plans. |
|
| 08/06/2026 | ENGR Paving | Passed | On-site paving is completed in accordance with approved plans. Striping will be verified on a separate inspection. | |
| 08/06/2026 | Passed | Walls are complete in accordance with approved plans. | ||
| 08/06/2026 | For trash and recycling enclosures | Passed | Refuse enclosure is complete in accordance with approved plans. | |
| 08/11/2026 | NPPO Final | Passed | NPPO items have been preserved as required. | |
| 08/11/2026 | Passed | Finished concrete is within acceptable tolerances. Accessible routes are in compliance with ADA requirements. Pedestrian circulation is completed in accordance with approved plans and has the correct slopes and cross-slopes. |