Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Permit Number - TD-DEV-0924-00264

Inspection Description - PDSD Engineering Division Pre-Construction SITE

Inspection Status - Passed

Date Description Inspector Results Comments
01/22/2026 PDSD Engineering Division Pre-Construction SITE Passed 1/22/26 - Site meeting held today. Items that need addressed: install wattle to prevent runoff, stake porta-potties to prevent tipping, post SWPPP signage. Once complete, schedule "Stormwater Initial" inspection.