Inspection History Details
Inspection Status: Passed
Inspection History
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/11/2026 | Passed | Finished concrete is within acceptable tolerances. Accessible routes are in compliance with ADA requirements. Pedestrian circulation is completed in accordance with approved plans and has the correct slopes and cross-slopes. |