Permit: TD-DEV-0924-00259
Permit Details
Status:
In Review
Type:
Development Package
Address:
7040 E VALENCIA RD
Address NEW:
7040 E VALENCIA RD
Apply Date:
09/18/2024
Applicant:
Bill Park
Description:
Revision 2 - Fenced lots, lighting, gated entry, started 02.19.2026** Revision 1 - irrigation update ** New contractor storage yard
Permit Reviews
Permit Number - TD-DEV-0924-00259
Permit Status: In review
Permit Description: Revision 2 - Fenced lots, lighting, gated entry, started 02.19.2026** Revision 1 - irrigation update ** New contractor storage yard
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/07/2025 | DEVELOPMENT PACKAGE NEW v.2 | 03/07/2025 | APPROVED |
| 02/20/2026 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 03/16/2026 | APPROVED |
| 04/13/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | N/A | IN REVIEW |
| 02/19/2026 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 02/19/2026 | REQUIRES RESUBMIT |
| 08/26/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 09/22/2025 | APPROVED |
| 09/20/2024 | DEVELOPMENT PACKAGE NEW v.1 | 11/05/2024 | REQUIRES RESUBMIT |
| 08/26/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 08/26/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TD-DEV-0924-00259
Permit Status: In review
Permit Description: Revision 2 - Fenced lots, lighting, gated entry, started 02.19.2026** Revision 1 - irrigation update ** New contractor storage yard
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/02/2025 | CRWHPLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT |
Outstanding Inspections
Permit Status: In Review
Permit Number: TD-DEV-0924-00259
Permite Description: Revision 2 - Fenced lots, lighting, gated entry, started 02.19.2026** Revision 1 - irrigation update ** New contractor storage yard
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/09/2026 | ENGR - Drainage Structures | N/A | Not Ready | This is a drain pipe inspection. 6 inch HDPE drain pipe connecting basins one and two is not trenched correctly. Trench is barely over 6 inches wide. The result is a bowed drainpipe that cannot be bedded correctly. The other 6” HDPE drain pipe from basin 1 and out into stormwater channel is correct. This drain pipe is OK to backfill. Trim end of pipe and seal it cleanly at gunite channel. Reschedule inspection when drain pipe is trenched correct correctly with clearance on each side. |
| 04/09/2026 | COT - BASN - Drainage/Basin - Condition Inspection | N/A | Partial Pass | Basins two and three are correct. Basin one on the east side needs to be evened out so the basin is flat. And the basin top at same area needs to be raised at its lowest and so it is at the correct height. Send pictures of the last 20 ft of east end basin corrected. I discussed this with contractor 11 barrel cactus have been transplanted into basin from nursery. |
| 03/11/2026 | N/A | Partial Pass | 3/11/26 NE Entrance to lot. 2 18" HDPE Storm Drain Pipe is Placed correct to survey and plan with correct slope and trench and bedding. Joints correct. Ok to backfill. Submit compaction reports to the portal. |
Completed Inspections
Permit Status: In Review
Permit Number: TD-DEV-0924-00259
Permit Description: Revision 2 - Fenced lots, lighting, gated entry, started 02.19.2026** Revision 1 - irrigation update ** New contractor storage yard
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/08/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | 01/08/26 Owner/ GC is applying now for CGP and NOI and will have them for Initial NPPO before and Storm Water SWPPP inspections. These inspections will be done before start of grubbing/grading. No Fence yet will be up after grubbing starts for access. Survey will be done before work starts with benchmark placed. |
|
| 01/23/2026 | SITE - Stormwater Setup and Controls | Passed | 01/23/26 Trackout Wattle/fiber roll Concrete Washout Vehicle/equipment/materials storage areas. Refer to SWPPP Site plan -Discussed with Owner/GC SWPPP board, Book and Address which will be in place when Temp Fencing goes in with coordination with survey next week. -Perimeter has wattle installed per SWPPP Site plan. -Okay to start grubbing and moving TOS to nursery. PIP to remain in place. When Temp fencing is in place with SWPPP board and Book in place, Okay to start Grading. |
|
| 01/23/2026 | NPPO Pre-Construction | Passed | 01/23/26 Nursury location will be at SW corner of site inside fencing. Plants will be watered by water truck as needed. Plants Tagged and inventoried for PIP, TOS and RFS correctly. Okay to start Grubbing but move plants to nursery to plan. Request NPPO inspection again to inventory Nursery when ready. |