Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/08/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | 01/08/26 Owner/ GC is applying now for CGP and NOI and will have them for Initial NPPO before and Storm Water SWPPP inspections. These inspections will be done before start of grubbing/grading. No Fence yet will be up after grubbing starts for access. Survey will be done before work starts with benchmark placed. |