Permit: TD-DEV-0923-00401
Permit Details
Status:
Inspections
Type:
Development Package
Address:
5075 E VALENCIA RD
Address NEW:
5075 E VALENCIA RD
Apply Date:
09/21/2023
Applicant:
Geoff Sylvester
Description:
Super Star Car Wash - Valencia and I-10
Permit Reviews
Permit Number - TD-DEV-0923-00401
Permit Status: Inspections
Permit Description: Super Star Car Wash - Valencia and I-10
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/02/2024 | DEVELOPMENT PACKAGE NEW v.2 | 02/01/2024 | REQUIRES RESUBMIT |
| 09/25/2023 | DEVELOPMENT PACKAGE NEW v.1 | 11/03/2023 | REQUIRES RESUBMIT |
| 02/15/2024 | DEVELOPMENT PACKAGE NEW v.3 | 03/19/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TD-DEV-0923-00401
Permit Status: Inspections
Permit Description: Super Star Car Wash - Valencia and I-10
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/02/2025 | CRWHPLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0923-00401
Permite Description: Super Star Car Wash - Valencia and I-10
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/28/2025 | N/A | Partial Pass | Correct materials are being used according to the manufacturer's specs and design. There is a matt below the basins in this field. All piping has been sealed and rock and fabric installed correctly. Backfill is being completed on the system. | |
| 11/25/2025 | N/A | Partial Pass | 11/25/25 Ok to pour sidewalk ramps on west side of building at midpoint of building. Ok to pour sidewalk ramp to the south of building. Ok to pour scupper walls in same sidewalk. I will get email to contractor confirming this detail. Overflow drain from roof will have to be elbow down under scupper. Use expansion joint material at cold joints of scuppers. |
|
| 11/14/2025 | For trash and recycling enclosures | N/A | Not Ready | 11/14/25 Walls on Vacuum enclosure and Refuse enclosure are complete bollards in. Request inspection on floor rebar mat when ready. Curb that meets the end of the wall is not correct. They should be removed and aligned outside of Gate opening for correct gate clearance. |
Completed Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0923-00401
Permit Description: Super Star Car Wash - Valencia and I-10
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/12/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | In the pre-con it was noticed that the trash enclosure did not meet the city specs. NPPO is next and all 5 of the barrel cactus are missing prior to construction start. | |
| 06/16/2025 | NPPO Pre-Construction | Passed | 06/16/25, The 5 barrel cactus are missing, discussed was to replace 1 for 1 at time of landscape going in. Chad will have to decide if this is sufficient. | |
| 11/14/2025 | ENGR - Drainage Structures | Passed | 11/14/25 Drain pipe and structures all installed. Remaining drainage surface to Riprap Whia's etc. |