Inspection Status: Partial Pass
Inspection History
Permit Number - TD-DEV-0923-00401
Inspection Description -
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/02/2025 | Partial Pass | Contractor, good to pour the curb per the changes of the engineer of record on the west side of the building | ||
| 10/23/2025 | Partial Pass | Contractors good to pour the curb on the south west side. The sidewalk on the west side is not ready yet. Contractor will call in for another inspection. | ||
| 10/24/2025 | Partial Pass | compaction for sidewalk sub grade is good, >95%. Layout/forms are correct for proper dimensions and slopes. Okay to pour. | ||
| 11/14/2025 | Not Ready | |||
| 11/24/2025 | Partial Pass | 11/25/25 Ok to pour sidewalk ramps on west side of building at midpoint of building. Ok to pour sidewalk ramp to the south of building. Ok to pour scupper walls in same sidewalk. I will get email to contractor confirming this detail. Overflow drain from roof will have to be elbow down under scupper. Use expansion joint material at cold joints of scuppers. |