Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: For trash and recycling enclosures
Permit Number - TD-DEV-0923-00401
Inspection Description - For trash and recycling enclosures
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/30/2025 | For trash and recycling enclosures | Partial Pass | Footer location, depth, and reinforcement are correct. Bollard placement is correct. Okay to pour footing. | |
| 10/31/2025 | For trash and recycling enclosures | Not Ready | Vacuum enclosure at SW of parking lot, submitted plans are not yet approved. Footing reinforcement is accurate to submitted details and consistent with TSM 8-01.9.0. Any work done prior to City approval of revision is "At Risk". | |
| 11/14/2025 | For trash and recycling enclosures | Not Ready | 11/14/25 Walls on Vacuum enclosure and Refuse enclosure are complete bollards in. Request inspection on floor rebar mat when ready. Curb that meets the end of the wall is not correct. They should be removed and aligned outside of Gate opening for correct gate clearance. |
|
| 11/25/2025 | For trash and recycling enclosures | Partial Pass | 11/25/25 Floor of RE to the south rebar mat is in place correct. Expansion material in place around floor. Floor will drain correct through drain blocks at rear into Landscape. Okay to pour floor of S refuse container. No bollards in floor because this is a Vacuum encloser build as RE except bollards. Contractor informed me this refuse/vacuum encloser was in revision or it had been accepted but I am not able to verify. Contractor at risk per acceptance of revision. |