| 08/14/2025 | ENGR - Drainage Structures | Not Ready | Contractor is still excavating for the chambers. Also contractor needs the submittals for these chambers so we can take a look at them for the density. | |
| 08/18/2025 | ENGR - Drainage Structures | Partial Pass | Call Dr. installing the drainage chambers. I informed him that they needed a 5 foot overlap on the felt underneath the rock. | |
| 08/26/2025 | ENGR - Drainage Structures | Not Ready | ||
| 11/14/2025 | ENGR - Drainage Structures | Passed | 11/14/25 Drain pipe and structures all installed. Remaining drainage surface to Riprap Whia's etc. |