Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Development Package
Address:
2020 W PRINCE RD
Address NEW:
2020 W PRINCE RD
Apply Date:
07/19/2024
Applicant:
Chris Helgeson
Description:
Revision 1 - building demo, construction of a new loading dock and revised parking lot

Permit Reviews

Permit Number - TD-DEV-0724-00210
Permit Status: Issued
Permit Description: Revision 1 - building demo, construction of a new loading dock and revised parking lot
Start Date Submittal Complete Date Status  
01/02/2025 DEVELOPMENT PACKAGE NEW v.3 01/16/2025 APPROVED Review Details
07/22/2024 DEVELOPMENT PACKAGE NEW v.1 09/23/2024 REQUIRES RESUBMIT Review Details
06/18/2025 DEVELOPMENT PACKAGE NEW REVISION v.1 08/05/2025 APPROVED Review Details
11/15/2024 DEVELOPMENT PACKAGE NEW v.2 12/23/2024 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: TD-DEV-0724-00210
Permite Description: Revision 1 - building demo, construction of a new loading dock and revised parking lot
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
03/27/2025 COT - BASN - Drainage/Basin - Condition Inspection N/A Partial Pass Contractors good to pour the walls on the drainage structure south of the main building
04/07/2025 N/A Partial Pass Contractor is good to pour the wall
04/02/2025 ENGR - Drainage Structures N/A Partial Pass contractor set a preform storm manhole, and compacted looks good at this time. Also formed for footers for a Stillmore all coming south of the building.
04/28/2025 N/A Partial Pass Contract is good to pour the west end of the loading dock
12/04/2025 N/A Partial Pass The subgrade looks good and it’s ready for placing of AB.

Completed Inspections

Permit Status: Issued
Permit Number: TD-DEV-0724-00210
Permit Description: Revision 1 - building demo, construction of a new loading dock and revised parking lot
Total Completed Inspections - 1
Date Description Inspector Results Comments
03/26/2025 PDSD Engineering Division Pre-Construction SITE Passed Inform the contractor to call an inspections for all the flat work drainage and everything else per plan

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
DRAINAGE REPORT_V3.PDF DOCUMENTS VIEW
REV 1 - APPROVED - DEVELOPMENT PACKAGE REV 1_V1 - STAMPED 08.05.2025.PDF DOCUMENTS VIEW
DEVELOPMENT PACKAGE REV 1_V1.PDF DOCUMENTS VIEW
DP REVISION LETTER_V1.PDF DOCUMENTS VIEW
PREV APPROVED PLAN_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
DEVELOPMENT PACKAGE_V3.PDF DOCUMENTS VIEW