Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TD-DEV-0724-00210
Permit Details
Apply Date:
07/19/2024
Applicant:
Chris Helgeson
Description:
Revision 1 - building demo, construction of a new loading dock and revised parking lot
Permit Reviews
Permit Number - TD-DEV-0724-00210
Permit Status: Issued
Permit Description: Revision 1 - building demo, construction of a new loading dock and revised parking lot
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/02/2025 | DEVELOPMENT PACKAGE NEW v.3 | 01/16/2025 | APPROVED |
| 07/22/2024 | DEVELOPMENT PACKAGE NEW v.1 | 09/23/2024 | REQUIRES RESUBMIT |
| 06/18/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 08/05/2025 | APPROVED |
| 11/15/2024 | DEVELOPMENT PACKAGE NEW v.2 | 12/23/2024 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Issued
Permit Number: TD-DEV-0724-00210
Permite Description: Revision 1 - building demo, construction of a new loading dock and revised parking lot
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/27/2025 | COT - BASN - Drainage/Basin - Condition Inspection | N/A | Partial Pass | Contractors good to pour the walls on the drainage structure south of the main building |
| 04/07/2025 | N/A | Partial Pass | Contractor is good to pour the wall | |
| 04/02/2025 | ENGR - Drainage Structures | N/A | Partial Pass | contractor set a preform storm manhole, and compacted looks good at this time. Also formed for footers for a Stillmore all coming south of the building. |
| 04/28/2025 | N/A | Partial Pass | Contract is good to pour the west end of the loading dock | |
| 12/04/2025 | N/A | Partial Pass | The subgrade looks good and it’s ready for placing of AB. |
Completed Inspections
Permit Status: Issued
Permit Number: TD-DEV-0724-00210
Permit Description: Revision 1 - building demo, construction of a new loading dock and revised parking lot
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/26/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | Inform the contractor to call an inspections for all the flat work drainage and everything else per plan |