Inspection Status: Partial Pass
Inspection History
| Date |
Description |
Inspector |
Results |
Comments |
| 09/18/2025 |
|
|
Partial Pass |
This was not a rough grading. It was initial consultation. Reviewed the plans for the basement and the parking lot on the revised set of plans. |
| 11/18/2025 |
|
|
Partial Pass |
Contractor moved extruded curb and replaced it with type two vertical curb in the parking lot. Also forming up for vertical curb by the freeway everything’s good to pour. |
| 12/04/2025 |
|
|
Partial Pass |
The subgrade looks good and it’s ready for placing of AB. |
| 12/17/2025 |
|
|
Passed |
Contractor pave the parking lot everything looks good |