Inspection History Details
Inspection Status: Partial Pass
Inspection History
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/07/2025 | Partial Pass | Contractor is good to pour the wall |
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/07/2025 | Partial Pass | Contractor is good to pour the wall |