Permit: TD-DEV-0724-00210

Parcel: 10610005D


Addresses:

2020 W PRINCE RD

Inspection Status: Partial Pass

Inspection History: ENGR - Drainage Structures

Date Description Inspector Results Comments
04/02/2025 ENGR - Drainage Structures Partial Pass contractor set a preform storm manhole, and compacted looks good at this time. Also formed for footers for a Stillmore all coming south of the building.
04/03/2025 ENGR - Drainage Structures Partial Pass contractor dived into the existing floor into the floor 6 inches tide rebar 2 foot out on 18 in centers good poor
04/15/2025 ENGR - Drainage Structures Partial Pass Contractors good to pour the floor for the loading dock on the west end and the channel up against the south wall