Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
| Date |
Description |
Inspector |
Results |
Comments |
| 04/02/2025 |
ENGR - Drainage Structures |
|
Partial Pass |
contractor set a preform storm manhole, and compacted looks good at this time. Also formed for footers for a Stillmore all coming south of the building. |
| 04/03/2025 |
ENGR - Drainage Structures |
|
Partial Pass |
contractor dived into the existing floor into the floor 6 inches tide rebar 2 foot out on 18 in centers good poor |
| 04/15/2025 |
ENGR - Drainage Structures |
|
Partial Pass |
Contractors good to pour the floor for the loading dock on the west end and the channel up against the south wall |