Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
405 W SPEEDWAY BL
Apply Date:
07/26/2023
Applicant:
Edward Yunkherr
Description:
Revision 2 - sidewalk extension and 3 monument signs *Revision #1 (building sf/name change) started 6/21/24* 2 new commercial buildings and fuel station with new parking lot on currently vacant land

Permit Reviews

Permit Number - TD-DEV-0723-00335
Permit Status: Complete
Permit Description: Revision 2 - sidewalk extension and 3 monument signs *Revision #1 (building sf/name change) started 6/21/24* 2 new commercial buildings and fuel station with new parking lot on currently vacant land
Start Date Submittal Complete Date Status  
11/24/2023 DEVELOPMENT PACKAGE NEW v.2 01/11/2024 REQUIRES RESUBMIT Review Details
02/26/2024 DEVELOPMENT PACKAGE NEW v.3 04/04/2024 APPROVED Review Details
07/27/2023 DEVELOPMENT PACKAGE NEW v.1 09/06/2023 REQUIRES RESUBMIT Review Details
03/20/2025 DEVELOPMENT PACKAGE NEW REVISION v.1 04/22/2025 APPROVED Review Details
06/21/2024 DEVELOPMENT PACKAGE NEW v.1 07/17/2024 APPROVED Review Details

Conditions

Permit Number - TD-DEV-0723-00335
Permit Status: Complete
Permit Description: Revision 2 - sidewalk extension and 3 monument signs *Revision #1 (building sf/name change) started 6/21/24* 2 new commercial buildings and fuel station with new parking lot on currently vacant land
Date Description Comments
10/02/2025 CRWHPLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT

Outstanding Inspections

Permit Status: Complete
Permit Number: TD-DEV-0723-00335
Permite Description: Revision 2 - sidewalk extension and 3 monument signs *Revision #1 (building sf/name change) started 6/21/24* 2 new commercial buildings and fuel station with new parking lot on currently vacant land
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
09/18/2024 NPPO Pre-Construction N/A Not Applicable
08/20/2025 N/A Partial Pass Contractor continues to work on the grading around the building
05/05/2025 N/A Partial Pass Contractors good to pour the flooring underneath the canopy
09/04/2025 N/A Partial Pass 9/4/25
East wall screen wall-32"/4 courses high. Footing width and Depth are correct to SD 109. Reinforcing correct. Okay to pour footer.
Use horizontal reinforcement @ 16 oc. Call us out for pre grout inspection before grouting.
09/05/2025 For trash and recycling enclosures N/A Partial Pass 9/5/25
Weep holes, verts and bond beams correct. Okay to grout. Send me pictures of grout filling weep holes.
05/05/2025 ENGR Engineering Final N/A Partial Pass Contractors good to pour the flooring underneath the canopy

Completed Inspections

Permit Status: Complete
Permit Number: TD-DEV-0723-00335
Permit Description: Revision 2 - sidewalk extension and 3 monument signs *Revision #1 (building sf/name change) started 6/21/24* 2 new commercial buildings and fuel station with new parking lot on currently vacant land
Total Completed Inspections - 3
Date Description Inspector Results Comments
09/18/2024 PDSD Engineering Division Pre-Construction SITE Passed SWPPP board needs to be in place
10/24/2025 Final inspection to ensure all landscape and water harvesting SITE Passed
10/23/2025 ENGR Engineering Final Passed