Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: For trash and recycling enclosures
Permit Number - TD-DEV-0723-00335
Inspection Description - For trash and recycling enclosures
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/20/2025 | For trash and recycling enclosures | Partial Pass | Contractors good to pour the footer for the trash enclosure | |
| 09/03/2025 | For trash and recycling enclosures | Not Ready | 9/3/25 Pre grout inspection. Wall is at 6'. Bond beam at top of wall in place. Weep holes are needed at the footer in EVERY reinforced cell. Smaller holes than what is here are ok. Weep holes are missing for 2 at the 90 degree corners and 1 at each end cell of the wall. Weep holes are also needed in the center pillar at gate as well as 2 missing verts. Bond beam is needed at top of pillar as well. Not Okay to grout. Call this inspection back in when ready. |
|
| 09/05/2025 | For trash and recycling enclosures | Partial Pass | 9/5/25 Weep holes, verts and bond beams correct. Okay to grout. Send me pictures of grout filling weep holes. |
|
| 09/16/2025 | For trash and recycling enclosures | Partial Pass | bollards it’s good to pour for the trash enclosure | |
| 09/17/2025 | For trash and recycling enclosures | Partial Pass | Contractors good to pour the floor for the trash enclosure |