Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 05/05/2025 |
ENGR Engineering Final
|
|
Partial Pass |
Contractors good to pour the flooring underneath the canopy |
| 10/02/2025 |
ENGR Engineering Final
|
|
Partial Pass |
Contractor still has worked that needs to be completed. The canopy is not completed for a plan as yet there’s material still on site on the north east Quad that needs to be removed. And there’s landscaping that needs to be completed. |
| 10/23/2025 |
ENGR Engineering Final
|
|
Passed |
|