Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Development Package
Address:
10000 S RITA RD
Address NEW:
10000 S RITA RD
Apply Date:
07/13/2023
Applicant:
Description:
Restricted Record - *Revision #4(Phase 2) started 11/5/24 *Revision #3 (switch yard expansion) started 7/1/2024* *Revision #2 started 3/21/24 (grading)* *Revision #1 started 2/9/24* Roadrunner Reserve

Permit Reviews

Permit Number - TD-DEV-0723-00309
Permit Status: Inspections
Permit Description: Restricted Record - *Revision #4(Phase 2) started 11/5/24 *Revision #3 (switch yard expansion) started 7/1/2024* *Revision #2 started 3/21/24 (grading)* *Revision #1 started 2/9/24* Roadrunner Reserve
Start Date Submittal Complete Date Status  
07/14/2023 DEVELOPMENT PACKAGE NEW v.1 08/24/2023 REQUIRES RESUBMIT Review Details
10/26/2023 DEVELOPMENT PACKAGE NEW v.2 11/16/2023 APPROVED Review Details
07/01/2024 DEVELOPMENT PACKAGE NEW v.1 07/29/2024 APPROVED Review Details
03/21/2024 DEVELOPMENT PACKAGE NEW v.1 04/25/2024 APPROVED Review Details
02/09/2024 DEVELOPMENT PACKAGE NEW v.1 03/21/2024 APPROVED Review Details
11/05/2024 DEVELOPMENT PACKAGE NEW REVISION v.1 11/21/2024 APPROVED Review Details

Outstanding Inspections

Permit Status: Inspections
Permit Number: TD-DEV-0723-00309
Permite Description: Restricted Record - *Revision #4(Phase 2) started 11/5/24 *Revision #3 (switch yard expansion) started 7/1/2024* *Revision #2 started 3/21/24 (grading)* *Revision #1 started 2/9/24* Roadrunner Reserve
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
05/20/2024 SITE - Stormwater Setup and Controls N/A Partial Pass STORMWATER set up in control. No concerns at this time. pads for transformers1A-2 to 1B -3
10/03/2024 COT - ENGR - Stormwater N/A Complete (Recurring)
11/12/2024 SITE - Stormwater Follow-up N/A Complete (Recurring)

Completed Inspections

Permit Status: Inspections
Permit Number: TD-DEV-0723-00309
Permit Description: Restricted Record - *Revision #4(Phase 2) started 11/5/24 *Revision #3 (switch yard expansion) started 7/1/2024* *Revision #2 started 3/21/24 (grading)* *Revision #1 started 2/9/24* Roadrunner Reserve
Total Completed Inspections - 4
Date Description Inspector Results Comments
11/21/2023 PDSD Engineering Division Pre-Construction SITE Passed Met with the contractors and subcontractors, and the safety officer. Informed the general contractor to call inspections every two weeks or as needed.
06/05/2024 SITE - Stormwater Setup and Controls Passed This should have been completed quite a while ago. Emmanuel states this was completed with Martine around 12/01/2023. He states it showed in the system as recurring.
07/02/2024 ENGR - Drainage Structures Passed
11/08/2024 COT - ENGR - Stormwater Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
APPROVED REV2_1_ROADRUNNER RESERVE_DEV PLANS_V1.PDF DOCUMENTS VIEW
APPROVED REV2_1_ROADRUNNER RESERVE_DEV PLANS_V1.PDF DOCUMENTS VIEW