Address: 10000 S RITA RD
Date - 12/07/2025 4:08 a.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C15-95-03 Harrison/I-10 8562 8625

Rezoning Cases

Date - 12/07/2025 4:08 a.m.
Total Number Of Rezone Cases - (3)
Case No. Description New Zone Status Status Date
C9-01-02 TEP - Rita Road I-2 Expired 04/11/2006
TP-ENT-0323-00018 Roadrunner Reserve (TEP Battery Energy Storage) I-2 Authorized 03/13/2023
TP-ENT-0425-00006 Rita 10 PCD In Review 04/07/2025

Permits

Address: 10000 S RITA RD
Date - 12/07/2025 4:08 a.m.
Total Number Of Permits - (23)
Permit Status Apply Date Expired Date Unit Type Description
TC-FBB-1223-00029 Issued 12/19/2023 02/19/2025 Factory Built Buildings AZ800 Roadrunner Reserve Battery Energy Storage System (BESS), for (TEP) the owner, DP # TD-DEV-0723-00309. Temporary Use Permit: TZ-PMT-1223-00128. Utility Power utilized on temporary trailers to support construction.
TZ-PMT-1223-00128 Issued 12/18/2023 12/18/2025 Zoning Permit Annual AZ800 Roadrunner Reserve, a Battery Energy Storage System (BESS), is presently in the construction phase as part of approved Development Package # TD-DEV-0723-00309. Temporary trailer, Connex and parking will be necessary to facilitate meetings, provide storage, and support other associated activities throughout the duration of the construction project.
TZ-PMT-1223-00121 Void 12/06/2023 N/A Zoning Permit Annual ** VOID - UNDER PERMIT TZ-PMT-1223-00128** AZ800 Roadrunner Reserve, a Battery Energy Storage System (BESS), is presently in the construction phase as part of approved Development Package # TD-DEV-0723-00309. Temporary trailers will be necessary to facilitate meetings, provide storage, and support other associated activities throughout the duration of the construction project.
TZ-PMT-1223-00122 Void 12/06/2023 N/A Zoning Permit Annual **VOID - DUPLICATE** AZ800 Roadrunner Reserve, a Battery Energy Storage System (BESS), is presently in the construction phase as part of approved Development Package # TD-DEV-0723-00309. Temporary trailers will be necessary to facilitate meetings, provide storage, and support other associated activities throughout the duration of the construction project. This is the application for one Sided Trailer #2 for the project.
TZ-PMT-1223-00123 Void 12/06/2023 N/A Zoning Permit Annual **VOID - DUPLICATE** AZ800 Roadrunner Reserve, a Battery Energy Storage System (BESS), is presently in the construction phase as part of approved Development Package # TD-DEV-0723-00309. Temporary trailers will be necessary to facilitate meetings, provide storage, and support other associated activities throughout the duration of the construction project. This permit is the application for one Sided Trailer #3 for the project.
TZ-PMT-1223-00124 Void 12/06/2023 N/A Zoning Permit Annual **VOID - DUPLICATE** AZ800 Roadrunner Reserve, a Battery Energy Storage System (BESS), is presently in the construction phase as part of approved Development Package # TD-DEV-0723-00309. Temporary trailers will be necessary to facilitate meetings, provide storage, and support other associated activities throughout the duration of the construction project. This permit is the application for one Sided Trailer #4 for the project.
TZ-PMT-1223-00125 Void 12/06/2023 N/A Zoning Permit Annual **VOID - DUPLICATE** AZ800 Roadrunner Reserve, a Battery Energy Storage System (BESS), is presently in the construction phase as part of approved Development Package # TD-DEV-0723-00309. Temporary trailers will be necessary to facilitate meetings, provide storage, and support other associated activities throughout the duration of the construction project. This permit is the application for one Sided Trailer #5 for the project.
TS-PRM-1225-00497 Submitted - Online 12/03/2025 N/A Sign - Permanent Tucson Electric Power seeks to install a sign on South Rita Road to direct First Responders (fire, police, etc) to TEP's new Roadrunner Reserve Battery system
TS-PRT-0923-00007 Issued 09/19/2023 09/18/2024 Sign - Annual Portable This 3'x6' sign will be installed as a permanent monument type sign; however, will be temporarily in place until the conclusion of project construction. The sign will be 5-feet in height from grade, with 2-feet clearance from graded surface. Sign will by plywood, mounted onto 4"x4" wooden posts, with 3' embedment within 3,000 PSI concrete. This sign will be adjacent to the proposed site entrance as depicted in attachments.
TD-DEV-0924-00258 Void 09/17/2024 09/17/2025 Development Package *VOID* REFER TO TD-DEV-0723-00309 (Restriced Access - TEP Roadrunner Reserve 2 BESS
TS-PRM-0923-00509 Void 09/15/2023 03/13/2024 Sign - Permanent (APPLY FOR PORTABLE TYPE SIGN CATEGORY FOR POST / PANEL ON THE PORTAL) This 3'x6' sign will be installed as a permanent monument type sign; however, will be temporarily in place until the conclusion of project construction. The sign will be 5-feet in height from grade, with 2-feet clearance from graded surface. Sign will by plywood, mounted onto 4"x4" wooden posts, with 3' embedment within 3,000 PSI concrete. This sign will be adjacent to the proposed site entrance as depicted in attachments.
TC-COM-0924-01725 Void 09/05/2024 03/04/2025 Commercial Building WRONG PERMIT TYPE - PLEASE APPLY FOR A UTILITY PERMIT - Install owner provided electrical equipment, conductors and wiring in owner provided prefabricated building. For future connection at facility
TC-COM-0924-01712 Inspections Complete 09/03/2024 07/28/2025 Commercial Building A 12 ft high screen wall for a TEP Phase 1 & Phase 2 switchyard.
TD-DEV-0723-00309 Inspections 07/13/2023 06/22/2028 Development Package Restricted Record - *Revision #4(Phase 2) started 11/5/24 *Revision #3 (switch yard expansion) started 7/1/2024* *Revision #2 started 3/21/24 (grading)* *Revision #1 started 2/9/24* Roadrunner Reserve
TC-COM-0625-01083 Needs Resubmittal 06/02/2025 N/A Commercial Building Replacement chain link fence around an exiting substation with a CMU block fence. 1500000.00
TC-COM-0324-00483 Withdrawn 03/18/2024 10/15/2024 Commercial Building A 12 ft high screen wall for a TEP switchyard.
TS-PRT-0325-00001 Issued 03/10/2025 03/10/2026 Sign - Annual Portable Extend the Permit Number: TS-PRT-0923-00007 for commercial post/panel sign for Roadrunner Reserve project during construction activities.
TS-PRT-0325-00002 Issued 03/10/2025 03/10/2026 Sign - Annual Portable Extend Permit Number: TS-PRT-0923-00007 for Roadrunner Reserve Project
TD-DEV-0125-00024 Approved 01/22/2025 N/A Development Package Restricted Record - Development Plan for the construction of a CMU security wall around existing TEP electrical substation in order to improve security.
P99AN03268 ISSUED 11/09/1999 N/A ADDRNEW
T11CM01746 FINAL 06/03/2011 02/27/2012 COMBO UPGRADE EXISTING ANTENNAS
T17RW03697 FINAL 08/18/2017 09/10/2017 ROW EMERGENCY REMOVE 2 POLES AND ANCHORS AND INSTALL ONE NEW SELF-SUPPORTING POLE WITH CONCRETE BACKFILL
T99CM05365 FINAL 11/09/1999 09/24/2000 COMBO EQUIPMENT SHELTER

Plans

Address: 10000 S RITA RD
Date - 12/07/2025 4:08 a.m.
Total Number Of Plans - (5)
Plan Number Status Application Date Exp Date Unit Type Description
C9-01-02 Expired 02/01/2001 08/06/2011 -- Rezoning TEP - Rita Road - The preliminary development plan is for a natural gas fired electric generation facility on 64.6 acres, leaving 113 acres as Natural Undisturbed Open Space (NUOS), 10.1 acres of which is the site of a proposed future solar power electric generation facility. Time expires 8/6/2006. Applicant has submitted a request for time extension.
TP-ENT-0323-00018 Authorized 03/13/2023 N/A -- Rezoning Rezoning TEP Vail Substation from RH to I2 for the construction of a 200MW Battery Energy Storage project and a new 230kV Substation on 218 acres.
TP-PRE-1024-00229 Complete 10/01/2024 N/A -- Pre-Application Conference TEP intends to replace the existing chain link fencing a CMU wall and expand the fence line to encompass a future 230KV substation.
TP-PRE-1122-00027 Complete 11/14/2022 N/A -- Pre-Application Conference Rezoning from RH to I2 for a 230kV Substation and 200MW Battery Energy Storage facility.
T20PRE0116 CLOSED 09/04/2020 N/A NEIGHBORHOOD NOTIFICATION -- LABELS Site/Grading/Board Adjust/ DDO : Vail Substation.

Record Requests

Address: 10000 S RITA RD
Date - 12/07/2025 4:08 a.m.
Total Number Of Requests - (3)
Request Number Status Request Date Completed Date Type Description
REQ-0824-05294 Approved 08/05/2024 08/22/2024 Requests Project is being constructed. Workers need more time on project. the project will be completed a year from now, 12 months.
REQ-1024-07032 Complete 10/15/2024 10/16/2024 Requests A 12 ft high screen wall for a TEP switchyard.
REQ-1222-00311 Complete 12/06/2022 12/06/2022 Requests Rezoning from RH to I2 for a 230kV Substation and 200MW Battery Energy Storage facility.