Permit: TD-DEV-0723-00309

Parcel: 30501005A


Addresses:

10000 S RITA RD

Inspection Status: Partial Pass

Inspection History: COT - ENGR - Stormwater

Date Description Inspector Results Comments
01/02/2024 COT - ENGR - Stormwater Partial Pass contractor installed HDPE. ONE RUN OF HUNDRED lineal feet. And another run of 75 lineal feet. I informed the contractor that the compaction should be at 95+. If the engineer of record approved less than that, would like copies of the documentation for the density.
01/17/2024 COT - ENGR - Stormwater Complete (Recurring) No concerns at this time. Everything looks good. Contractors cutting the grade for the basin on the west end of the project.
01/31/2024 COT - ENGR - Stormwater Partial Pass No concerns at this time contractors continue to work on stormwater basins Escavating
02/15/2024 COT - ENGR - Stormwater Complete (Recurring) no concerns at this time. All the wattles are still in place and the silk fence is still in place
03/13/2024 COT - ENGR - Stormwater Complete (Recurring) This site is so well maintained that I think it should be used as a model for how stormwater implementation should be done.
04/03/2024 COT - ENGR - Stormwater Complete (Recurring) There’s no concerns at this time everything seems to be draining properly
04/17/2024 COT - ENGR - Stormwater Complete (Recurring) No concerns at this time
05/01/2024 COT - ENGR - Stormwater Complete (Recurring) No concerns at this time
05/15/2024 COT - ENGR - Stormwater Complete (Recurring) No concerns at this time. Everything looks very good.
06/05/2024 COT - ENGR - Stormwater Complete (Recurring) Looks great.
07/02/2024 COT - ENGR - Stormwater Complete (Recurring) Site is pristine with no incedents to report.
07/25/2024 COT - ENGR - Stormwater Complete (Recurring) No concerns at this time. There was no rain damage.
10/03/2024 COT - ENGR - Stormwater Complete (Recurring)
11/08/2024 COT - ENGR - Stormwater Passed
12/19/2023 COT - ENGR - Stormwater Re-inspection required Contractor text me this morning at 6:45 AM and canceled the inspection for today. Will reschedule at another time.