Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
Permit Number - TD-DEV-0723-00309
Inspection Description - ENGR - Drainage Structures
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/17/2024 | ENGR - Drainage Structures | Partial Pass | contractor for me for a dot collarwho is a 36 inch HDPE to existing 36 inch CMP pipe pipe collar | |
| 01/18/2024 | ENGR - Drainage Structures | Partial Pass | Contractor foreman for HEADWALL’s for 36 inch pipe. Good to pour. | |
| 01/31/2024 | ENGR - Drainage Structures | Partial Pass | No activity at this time for rebar installation | |
| 07/02/2024 | ENGR - Drainage Structures | Passed |