Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
| Date |
Description |
Inspector |
Results |
Comments |
| 01/17/2024 |
ENGR - Drainage Structures |
|
Partial Pass |
contractor for me for a dot collarwho is a 36 inch HDPE to existing 36 inch CMP pipe pipe collar |
| 01/18/2024 |
ENGR - Drainage Structures |
|
Partial Pass |
Contractor foreman for HEADWALL’s for 36 inch pipe. Good to pour. |
| 01/31/2024 |
ENGR - Drainage Structures |
|
Partial Pass |
No activity at this time for rebar installation |
| 07/02/2024 |
ENGR - Drainage Structures |
|
Passed |
|