Permit: TD-DEV-0624-00187
Permit Details
Apply Date:
06/27/2024
Applicant:
Lawrence McManus
Description:
950 sf Coffee with Dual Drive through
Permit Reviews
Permit Number - TD-DEV-0624-00187
Permit Status: Complete
Permit Description: 950 sf Coffee with Dual Drive through
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/12/2025 | DEVELOPMENT PACKAGE NEW v.4 | 03/13/2025 | REQUIRES RESUBMIT |
| 07/08/2024 | DEVELOPMENT PACKAGE NEW v.2 | 08/20/2024 | REQUIRES RESUBMIT |
| 06/28/2024 | DEVELOPMENT PACKAGE NEW v.1 | 07/05/2024 | REQUIRES RESUBMIT |
| 04/11/2025 | DEVELOPMENT PACKAGE NEW v.5 | 05/19/2025 | APPROVED |
| 10/17/2024 | DEVELOPMENT PACKAGE NEW v.3 | 01/08/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TD-DEV-0624-00187
Permit Status: Complete
Permit Description: 950 sf Coffee with Dual Drive through
| Date | Description | Comments |
|---|---|---|
| 10/02/2025 | CRWHPLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT |
Outstanding Inspections
Permit Status: Complete
Permit Number: TD-DEV-0624-00187
Permite Description: 950 sf Coffee with Dual Drive through
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| Consultation SITE | N/A | Not Ready | This inspection should be on permit TC-UTL-0525-00039. Include backwater valve and resubmit. Then request sewer inspection against Utility Permit | |
| 07/08/2025 | ENGR - Drainage Structures | N/A | Partial Pass | Partial pass until all structures are completed. see additional notes in the system for the dry well installation on the 7th of July. |
| 07/17/2025 | N/A | Not Ready | 7/17/25 Three catch basins SDCB#1 thru #3 Pipe type and dimensions are correct. Precast Catch Basins match plans. Rims and Invert Elevations are all higher than plan. The elevations are not to plan making slope of pipes not to plan. They are all too steep. Inverts and Rims need to be to plan before pipes are connected to CB's. These elevations need to be verified by surveyor and corrected to plan. 8" PVC may need to be exposed and reconnected to Drywell. Drywell elevation and CB elevation need to be verified and corrected if nessisary. Basin Elevations also need to be verified . |
|
| 08/11/2025 | For trash and recycling enclosures | N/A | Partial Pass | 8/11/25 #4 verts are in place except one vert in corner is missing but it will be wet set. Bond beam at top is in place. 7 courses need to be grouted-vibrate all grouted cells and send good pictures of them vibrating ... After grout we will need to see the mat for the floor and the bollards. Call us out when ready for inspection. 3 columns at drive through are also okay to grout. 16 x 16” #5 verts in place. #3 rings @8” oc in place. |
| 09/15/2025 | N/A | Partial Pass | ADA parking section in front of of restaurant and drive through pad. Both good to pour. |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-0624-00187
Permit Description: 950 sf Coffee with Dual Drive through
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/23/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | Change the SWPPP sheet to show wattle vs. silt fence. Install track pad. Put up the correct address. Allowed today to scrape and grub only. Next inspection as soon as the above is completed will be the Stormwater Initial. once that is completed the remainder of the inspections per. this site will populate in the system. | |
| 05/28/2025 | SITE - Stormwater Setup and Controls | Passed | ||
| 11/13/2025 | ENGR Engineering Final | Passed | ||
| 11/13/2025 | Final inspection to ensure all landscape and water harvesting SITE | Passed | ||
| 11/13/2025 | LAND Landscape Appearance & Function Final | Passed |