Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Parcel Attributes
Parcel140267850
JurisdictionTucson, Pima County
City of Tucson ZoningR-1, P-I
Tucson WardWard 5
Major Street & Route

Gateway Route
-
Intersection Buffer

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Address: 5735 S TUCSON BL
Date - 12/17/2025 6:04 a.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 2045

Rezoning Cases

Date - 12/17/2025 6:04 a.m.
Total Number Of Rezone Cases - (3)
Case No. Description New Zone Status Status Date
C9-84-47 Weiner - Tucson Boulevard I-1 Expired 06/30/2010
C9-94-32 Country Club Industrial Properties - Country Club Road I-1 Effectuated 08/31/2009
C9-94-32 Country Club Industrial Properties - Country Club Road P-I Effectuated 08/31/2009

Permits

Address: 5735 S TUCSON BL
Date - 12/17/2025 6:04 a.m.
Total Number Of Permits - (8)
Permit Status Apply Date Expired Date Unit Type Description
DP15-0164 Approved 09/17/2015 N/A Development Package SITE/GRADING-RETAIL CENTER
TD-DEV-0624-00187 Complete 06/27/2024 11/13/2028 Development Package 950 sf Coffee with Dual Drive through
TS-PRM-0524-00243 Void 05/31/2024 11/27/2024 Sign - Permanent (Insufficient info provided for review) Remove 2 existing monument and replace with new on the same location as existing.
TC-UTL-0525-00039 Needs Resubmittal 05/21/2025 N/A Utilities Permit 950 sf Coffee with Dual Drive through
T19RW00657 FINAL 02/06/2019 03/13/2019 ROW UPGRADE IRRIGATION SYSTEM IN MEDIAN ISLANDS. WILL REQUIRE LEFT LANES IN BOTH DIRECTIONS. 03/04/19 - CHANGE IN TIME SET-UP AS FOLLOWS: EARLY SETUP FOR TUCSON BLVD NB INSIDE LANE ONLY. THE INSIDE SB LANE WILL REMAIN OPEN UNTIL 9AM TO ACCOMMODATE AIRPORT TRAFFIC.
T19RW02602 FINAL 05/08/2019 07/05/2019 ROW N.523606 JOB WILL REQUIRE ACCESS TO HH # 14363 TO SPLICE FIBER ADDRESS ON APPLICATION - 2501 E DREXEL RD
T19RW02604 FINAL 05/08/2019 07/05/2019 ROW N.523606 JOB WILL REQUIRE ACCESS TO HH # 16243 AND HH# 16435 TO SPLICE FIBER ADDRESS ON APPLICATION - 2560 E TUCSON BL; TUCSON BL RUNS NORTH AND SOUTH
T21RW04677 FINAL 10/14/2021 01/08/2021 ROW Bore 242' to place 3-1.25" innerduct and trench 7' to place 1-4" conduit. Place 2-30x48 handholes, dig bore pits immediately adjacent to or directly associated with a small wireless facility. Work located on east and west sides of S Tucson Bl, south of E Drexel Rd.

Plans

Address: 5735 S TUCSON BL
Date - 12/17/2025 6:04 a.m.
Total Number Of Plans - (5)
Plan Number Status Application Date Exp Date Unit Type Description
S15-050 Submitted 10/30/2015 N/A -- Subdivision/Plats TACC TRACT NO.2 FINAL PLAT
T22PRE0057 In Review 03/11/2022 N/A -- Pre-Application Conference Retail Development - Site: Retail development for a fast food restaurant with a drive thru and a tunnel car wash facility.
TD-DIV-0825-00083 Awaiting Customer Attention 08/19/2025 N/A -- Land Split/Lot Split This Land Split will separate the Dutch Bro's Coffee land from the remaining, vacant land.
TP-PRE-0424-00086 Complete 04/03/2024 N/A -- Pre-Application Conference Construction of a 950 SF Dutch Bros Coffee with dual drive-through lanes and a customer walk-up service window.
TW-CWH-1125-00001 Active 11/14/2025 N/A -- Commercial Water Harvesting Ordinance 950 sf Coffee with Dual Drive through CRWH PLAN

Record Requests

Address: 5735 S TUCSON BL
Date - 12/17/2025 6:04 a.m.
Total Number Of Requests - (1)
Request Number Status Request Date Completed Date Type Description
REQ-1124-08022 Denied 11/25/2024 N/A Requests * not needed at this time*/// Remove 2 existing monument and replace with new on the same location as existing. We are still waiting to hear back regarding MSP TS-MSP0824-00006 submitted, have tried to reach out by email and phone several times, need more time cause we haven't been able to move forward yet