Permit: TD-DEV-0623-00283
Permit Details
Apply Date:
06/19/2023
Applicant:
MATT UPDEGRAFF
Description:
Restricted Access - Revision 1 - New medical facility, bldg to be demo'ed
Permit Reviews
Permit Number - TD-DEV-0623-00283
Permit Status: Inspections
Permit Description: Restricted Access - Revision 1 - New medical facility, bldg to be demo'ed
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/25/2024 | DEVELOPMENT PACKAGE NEW v.1 | 08/14/2024 | REQUIRES RESUBMIT |
11/06/2023 | DEVELOPMENT PACKAGE NEW v.2 | 12/08/2023 | REQUIRES RESUBMIT |
01/12/2024 | DEVELOPMENT PACKAGE NEW v.3 | 03/13/2024 | APPROVED |
06/20/2023 | DEVELOPMENT PACKAGE NEW v.1 | 08/09/2023 | REQUIRES RESUBMIT |
08/27/2024 | DEVELOPMENT PACKAGE NEW v.2 | 09/30/2024 | APPROVED |
Completed Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0623-00283
Permit Description: Restricted Access - Revision 1 - New medical facility, bldg to be demo'ed
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/29/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | contractor needs to get a letter from engineering of record to sign off on all the storm dreamed that has been placed from January 27 back to the start of the project. The City Of Tucson will start inspecting all the stormwater drains and water harvesting and spillway starting from January 28 forward. Contractor also needs to be aware that the City Of Tucson will need all third-party testing for subgrade AB grade and asphalt and concrete starting January 29. Contractor needs to have all third-party testing file on site at all times with a large set of approved plans and as built and changes. |