Inspection History Details
Inspection Status: Partial Pass
Inspection History: Final inspection to ensure all landscape and water harvesting SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/13/2026 | Final inspection to ensure all landscape and water harvesting SITE | Partial Pass | Contractor addressed the areas that Ben had pointed out to him. They all look pretty good at this time. Contractors going to call in for engineering inspection sometime next week. | |
| 01/27/2026 | Final inspection to ensure all landscape and water harvesting SITE | Passed | ||
| 12/16/2025 | Final inspection to ensure all landscape and water harvesting SITE | Partial Pass | 12/16/25 Water Harvesting Basins 9,10 and 11 are not 6" below top of Curb. Basin 10 will be limited by the Grading plan but some of it can be cut in towards the curb cut next to it which will help with the drainage of the ADA parking adjacent to it...Correct these Areas as discussed with contractor. |