Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - TD-DEV-0623-00283
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/29/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | contractor needs to get a letter from engineering of record to sign off on all the storm dreamed that has been placed from January 27 back to the start of the project. The City Of Tucson will start inspecting all the stormwater drains and water harvesting and spillway starting from January 28 forward. Contractor also needs to be aware that the City Of Tucson will need all third-party testing for subgrade AB grade and asphalt and concrete starting January 29. Contractor needs to have all third-party testing file on site at all times with a large set of approved plans and as built and changes. |