Permit: TD-DEV-0623-00272
Permit Details
Status:
Complete
Type:
Development Package
Address:
1400 N SILVERBELL RD
Address NEW:
1400 N SILVERBELL RD
Apply Date:
06/08/2023
Applicant:
Jesus Arellano
Description:
Redevelopment of existing public park to include ballfields, new sidewalks, site lighting, concessions building, restrooms, and a new splash pad.
Permit Reviews
Permit Number - TD-DEV-0623-00272
Permit Status: Complete
Permit Description: Redevelopment of existing public park to include ballfields, new sidewalks, site lighting, concessions building, restrooms, and a new splash pad.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/09/2023 | DEVELOPMENT PACKAGE NEW v.1 | 06/12/2023 | REQUIRES RESUBMIT |
| 06/13/2023 | DEVELOPMENT PACKAGE NEW v.2 | 07/13/2023 | REQUIRES RESUBMIT |
| 09/29/2023 | DEVELOPMENT PACKAGE NEW v.4 | 11/13/2023 | APPROVED |
| 08/22/2023 | DEVELOPMENT PACKAGE NEW v.3 | 09/21/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TD-DEV-0623-00272
Permit Status: Complete
Permit Description: Redevelopment of existing public park to include ballfields, new sidewalks, site lighting, concessions building, restrooms, and a new splash pad.
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/18/2023 | Dust Control/Air Quality Permit is Required. (Utilized with DP's & TP's) |
Outstanding Inspections
Permit Status: Complete
Permit Number: TD-DEV-0623-00272
Permite Description: Redevelopment of existing public park to include ballfields, new sidewalks, site lighting, concessions building, restrooms, and a new splash pad.
Total Outstanding Inspections - 11
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/28/2023 | ENGR - Drainage Structures | N/A | Partial Pass | One double trash enclosure shall comply with City of Tucson standard detail 8.01 |
| 02/15/2024 | SITE | N/A | Partial Pass | Grading activities in progress |
| 04/04/2024 | SITE - Zoning Violation | N/A | Not Applicable | |
| 02/15/2024 | SITE - Stormwater Setup and Controls | N/A | Partial Pass | |
| 02/16/2024 | SITE - Stormwater Follow-up | N/A | Partial Pass | |
| 08/20/2024 | PDSD Engineering Division Pre-Construction SITE | N/A | Partial Pass | Contractor, good to pour 120 lineal feet of 10 foot sidewalk |
| 11/27/2024 | PDSD Site/Engineering Division - NPPO | N/A | Partial Pass | Contractor called in the wrong inspection. Contractor should’ve called in for flat work. Forming for 200 x 10 lineal feet of sidewalk and the Ramada on the southwest side pad. |
| 12/05/2024 | Consultation SITE | N/A | Partial Pass | walk through the whole project with the contractor looking for things that may concern us like the handicap parking is auto compliance, but the contractor did not pave with a new handicap. Parking area is. The tree staking the bamboo steaks need to be removed. Continue to pour and form for the Ramada areas, the water boxes need to be leveled out and sloped at 2%. The area on the west side by the ballpark either needs to install bollards or boulders so the cars won’t drive into the sidewalk area. |
| 11/18/2024 | N/A | Partial Pass | poured the sidewalk on the south end of the park by the playground | |
| 05/21/2025 | ENGR Grading Final | N/A | Re-inspection required | Contractor painted the fire curb along the parking lot as we requested. |
| 02/15/2024 | COT - ENGR - Stormwater | N/A | Partial Pass |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-0623-00272
Permit Description: Redevelopment of existing public park to include ballfields, new sidewalks, site lighting, concessions building, restrooms, and a new splash pad.
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/22/2024 | SITE - Zoning Compliance | Passed | ||
| 03/01/2024 | COT - SITE - Zoning Intermediate | Passed | ||
| 01/15/2025 | PDSD Site/Engineering Division - NPPO | Passed | There is no NPO on this site | |
| 04/10/2025 | Consultation SITE | Passed | I passed the light pole foundations, and the pole foundations for the Ramadas on the west side of the park | |
| 04/30/2025 | Passed | |||
| 05/22/2025 | ENGR Engineering Final | Passed | ||
| 05/22/2025 | COT - ENGR - Signage Final | Passed | ||
| 05/22/2025 | COT - ENGR - Stormwater | Passed |